Dealing with construction permits (DB16-20 methodology) - Score in Sri Lanka

Sri Lanka: Dealing with construction permits (DB16-20 methodology) - Score was 72.26 in 2019. ▲ Rising

Latest (2019)
72.26
Change on year
up 0.0%
World rank
66th
of 188 countries
All-time high
72.26
in 2019
All-time low
65.37
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Sri Lanka, 2014–2019

0204060802014201620192014: 65.42015: 69.32016: 68.32017: 68.32018: 72.22019: 72.3

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Sri Lanka is 72.26, measured in 2019. That is the highest value across all 6 years on record.

That represents a change of up 10.5% over ten years.

Sri Lanka ranks 66th of 188 countries on this measure, in the middle of the range.

Countries ranked near Sri Lanka

  1. 63 Maldives 72.99 compare
  2. 64 Canada 72.98 compare
  3. 65 Peru 72.53 compare
  4. 67 Zambia 72.09 compare
  5. 68 Kuwait 71.94 compare
  6. 69 Tonga 71.91 compare

See the full ranking of 190 places →

More private sector data for Sri Lanka

All data for Sri Lanka →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Sri Lanka?
Dealing with construction permits (db16-20 methodology) - score in Sri Lanka was 72.26 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Sri Lanka?
The highest recorded value was 72.26 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Sri Lanka?
The lowest recorded value was 65.37 in 2014.
How does Sri Lanka rank for dealing with construction permits (db16-20 methodology) - score?
Sri Lanka ranks 66th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Sri Lanka?
Over the last ten years it is up 10.5%. The long-run trend across the full record is rising.
Where does this Sri Lanka data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.