Dealing with construction permits: Time (days) - Score in Kazakhstan

Kazakhstan: Dealing with construction permits: Time (days) - Score was 77.95 in 2019. ▲ Rising

Latest (2019)
77.95
Change on year
up 5.9%
World rank
49th
of 188 countries
All-time high
77.95
in 2019
All-time low
31.41
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Kazakhstan, 2005–2019

0204060802005201220192005: 31.42006: 31.42007: 31.42008: 31.42009: 382010: 44.12011: 44.12012: 44.12013: 472014: 52.72015: 57.52016: 73.62017: 73.62018: 73.62019: 78

Source: World Bank.

Analysis

In 2019, dealing with construction permits: time (days) - score in Kazakhstan stood at 77.95. That is the highest value across all 15 years on record.

The figure is up 5.9% on the previous year and up 104.9% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Kazakhstan peaked at 77.95 in 2019 and was at its lowest, 31.41, in 2005.

That places Kazakhstan 49th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 32.74 31.41 38.04 5
2010s 58.83 44.09 77.95 10

Countries ranked near Kazakhstan

  1. 46 Cabo Verde 78.39 compare
  2. 47 Botswana 78.1 compare
  3. 47 Montenegro 78.1 compare
  4. 50 Estonia 77.81 compare
  5. 50 Kuwait 77.81 compare
  6. 52 Mauritania 77.52 compare

See the full ranking of 190 places →

More private sector data for Kazakhstan

All data for Kazakhstan →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Kazakhstan?
Dealing with construction permits: time (days) - score in Kazakhstan was 77.95 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Kazakhstan?
The highest recorded value was 77.95 in 2019.
What is the lowest dealing with construction permits: time (days) - score recorded in Kazakhstan?
The lowest recorded value was 31.41 in 2005.
How does Kazakhstan rank for dealing with construction permits: time (days) - score?
Kazakhstan ranks 49th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Kazakhstan?
Over the last ten years it is up 104.9%. The long-run trend across the full record is rising.
Where does this Kazakhstan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.