Dealing with construction permits: Time (days) - Score in Botswana

Botswana: Dealing with construction permits: Time (days) - Score was 78.1 in 2019. ▲ Rising

Latest (2019)
78.1
Change on year
unchanged
World rank
47th
of 188 countries
All-time high
78.1
in 2018
All-time low
50.14
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Botswana, 2005–2019

0204060802005201220192005: 50.12006: 50.12007: 50.12008: 50.12009: 50.12010: 50.12011: 50.12012: 50.12013: 76.42014: 76.42015: 76.42016: 76.92017: 76.92018: 78.12019: 78.1

Source: World Bank.

Analysis

Botswana recorded 78.1 for dealing with construction permits: time (days) - score in 2019. That is the highest value across all 15 years on record.

The figure is up 55.7% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Botswana peaked at 78.1 in 2018 and was at its lowest, 50.14, in 2005.

That places Botswana 47th out of 188 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 50.14 50.14 50.14 5
2010s 68.96 50.14 78.1 10

Countries ranked near Botswana

  1. 44 Saudi Arabia 78.67 compare
  2. 44 Turkiye 78.67 compare
  3. 46 Cabo Verde 78.39 compare
  4. 47 Montenegro 78.1 compare
  5. 49 Kazakhstan 77.95 compare
  6. 50 Estonia 77.81 compare
  7. 50 Kuwait 77.81 compare

See the full ranking of 190 places →

More private sector data for Botswana

All data for Botswana →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Botswana?
Dealing with construction permits: time (days) - score in Botswana was 78.1 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Botswana?
The highest recorded value was 78.1 in 2018.
What is the lowest dealing with construction permits: time (days) - score recorded in Botswana?
The lowest recorded value was 50.14 in 2005.
How does Botswana rank for dealing with construction permits: time (days) - score?
Botswana ranks 47th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Botswana?
Over the last ten years it is up 55.7%. The long-run trend across the full record is rising.
Where does this Botswana data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.