Dealing with construction permits: Time (days) - Score (Time days) in Rwanda

Rwanda: Dealing with construction permits: Time (days) - Score was 79.54 in 2019. ▲ Rising

Latest (2019)
79.54
Change on year
up 6.2%
World rank
37th
of 191 countries
All-time high
79.54
in 2019
All-time low
27.38
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Rwanda, 2005–2019

204060802005201220192005: 27.42006: 27.42007: 42.92008: 56.22009: 56.22010: 60.52011: 60.52012: 60.52013: 73.82014: 76.72015: 76.72016: 74.92017: 74.92018: 74.92019: 79.5

Source: World Bank.

Analysis

In 2019, dealing with construction permits: time (days) - score in Rwanda stood at 79.54. That is the highest value across all 15 years on record.

The figure is up 6.2% on the previous year and up 41.5% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Rwanda peaked at 79.54 in 2019 and was at its lowest, 27.38, in 2005.

Rwanda ranks 37th of 191 countries on this measure, in the top quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time (days) - Score in Rwanda, year by year

Annual values for Dealing with construction permits: Time (days) - Score in Rwanda, 2005 to 2019.
Year Value Change
2005 27.38 —
2006 27.38 +0.0%
2007 42.94 +56.8%
2008 56.2 +30.9%
2009 56.2 +0.0%
2010 60.52 +7.7%
2011 60.52 +0.0%
2012 60.52 +0.0%
2013 73.78 +21.9%
2014 76.66 +3.9%
2015 76.66 +0.0%
2016 74.93 -2.3%
2017 74.93 +0.0%
2018 74.93 +0.0%
2019 79.54 +6.2%

Rwanda compared with similar countries

  • Rwanda's 79.54 is above the median for low income countries, which is 64.84, 1.2× the median. (24 countries reporting)
  • Rwanda's 79.54 is above the median for Sub-Saharan Africa, which is 64.99, 1.2× the median. (48 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time (days) - Score in Rwanda changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2007 +56.8% 27.38 42.94
2008 +30.9% 42.94 56.2

Averages by decade

DecadeAverage LowestHighest Years
2000s 42.02 27.38 56.2 5
2010s 71.3 60.52 79.54 10

Countries ranked near Rwanda

  1. 35 New Zealand 80.69 compare
  2. 36 Mauritius 79.97 compare
  3. 37 Bulgaria 79.54 compare
  4. 37 Haiti 79.54 compare
  5. 40 Niger 79.25 compare

See the full ranking of 191 places →

More private sector data for Rwanda

All data for Rwanda →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Rwanda?
Dealing with construction permits: time (days) - score in Rwanda was 79.54 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Rwanda?
The highest recorded value was 79.54 in 2019.
What is the lowest dealing with construction permits: time (days) - score recorded in Rwanda?
The lowest recorded value was 27.38 in 2005.
How does Rwanda rank for dealing with construction permits: time (days) - score?
Rwanda ranks 37th out of 191 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Rwanda?
Over the last ten years it is up 41.5%. The long-run trend across the full record is rising.
Where does this Rwanda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time (days) - Score in Rwanda. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/rwanda/">Dealing with construction permits: Time (days) - Score in Rwanda</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 2,794 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.