Getting electricity: Minimum outage time (in minutes) in New Zealand
New Zealand: Getting electricity: Minimum outage time (in minutes) was 1 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in New Zealand, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for getting electricity: minimum outage time (in minutes) in New Zealand is 1 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
That places New Zealand 103rd out of 137 countries with data for 2019, putting it in the bottom quarter.
Getting electricity: Minimum outage time (in minutes) in New Zealand, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 1 DB16-20 methodology | — |
| 2015 | 1 DB16-20 methodology | +0.0% |
| 2016 | 1 DB16-20 methodology | +0.0% |
| 2017 | 1 DB16-20 methodology | +0.0% |
| 2018 | 1 DB16-20 methodology | +0.0% |
| 2019 | 1 DB16-20 methodology | +0.0% |
Countries ranked near New Zealand
- 103 Russian Federation 1 DB16-20 methodology compare
- 103 Japan 1 DB16-20 methodology compare
- 103 Antigua and Barbuda 1 DB16-20 methodology compare
- 103 Bahrain 1 DB16-20 methodology compare
- 103 Brunei Darussalam 1 DB16-20 methodology compare
- 103 Cambodia 1 DB16-20 methodology compare
- 103 Canada 1 DB16-20 methodology compare
- 103 Denmark 1 DB16-20 methodology compare
- 103 Hong Kong, China 1 DB16-20 methodology compare
- 103 Israel 1 DB16-20 methodology compare
- 103 Kazakhstan 1 DB16-20 methodology compare
- 103 Kenya 1 DB16-20 methodology compare
- 103 Malaysia 1 DB16-20 methodology compare
- 103 Morocco 1 DB16-20 methodology compare
- 103 Niger 1 DB16-20 methodology compare
- 103 San Marino 1 DB16-20 methodology compare
- 103 Seychelles 1 DB16-20 methodology compare
- 103 Taiwan, China 1 DB16-20 methodology compare
- 103 Thailand 1 DB16-20 methodology compare
- 103 Palestine, State of 1 DB16-20 methodology compare
More private sector data for New Zealand
- Merchandise trade 35.7% (2025)
- Food imports 12.8% (2025)
- Manufactures imports 70.7% (2025)
- Merchandise imports 47.55 billion current US$ (2025)
- Food exports 69.0% (2025)
- Manufactures exports 14.0% (2025)
- Merchandise exports 46.70 billion current US$ (2025)
- Merchandise exports (current US$), per capita 8,770 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.1769 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 10.43 % change on previous year (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in New Zealand?
- Getting electricity: minimum outage time (in minutes) in New Zealand was 1 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in New Zealand?
- The highest recorded value was 1 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in New Zealand?
- The lowest recorded value was 1 DB16-20 methodology in 2014.
- How does New Zealand rank for getting electricity: minimum outage time (in minutes)?
- New Zealand ranks 103rd out of 137 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in New Zealand?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this New Zealand data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.