Getting electricity: Procedures in Central African Republic
Central African Republic: Getting electricity: Procedures was 7 number in 2019. ▬ Flat
Getting electricity: Procedures in Central African Republic, 2009–2019
Source: World Bank. Measured in number.
Analysis
In 2019, getting electricity: procedures in Central African Republic stood at 7 number. That is the highest value across all 11 years on record.
The figure is unchanged over ten years.
Over the whole period, getting electricity: procedures in Central African Republic peaked at 7 number in 2009 and was at its lowest, 7 number, in 2009.
That places Central African Republic 9th out of 186 countries with data for 2019, putting it in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 7 number | 7 number | 7 number | 1 |
| 2010s | 7 number | 7 number | 7 number | 10 |
Countries ranked near Central African Republic
- 9 Nigeria 7 number compare
- 9 Angola 7 number compare
- 9 Bolivia 7 number compare
- 9 Canada 7 number compare
- 9 Dominican Republic 7 number compare
- 9 Ecuador 7 number compare
- 9 Gabon 7 number compare
- 9 Guinea-Bissau 7 number compare
- 9 Honduras 7 number compare
- 9 Jamaica 7 number compare
- 9 Kyrgyzstan 7 number compare
- 9 Laos 7 number compare
- 9 Montenegro 7 number compare
More private sector data for Central African Republic
- Merchandise trade 27.0% (2025)
- Food imports 20.9% (2024)
- Manufactures imports 51.1% (2024)
- Merchandise imports 573.00 million current US$ (2025)
- Food exports 0.2% (2024)
- Manufactures exports 71.8% (2024)
- Merchandise exports 255.00 million current US$ (2025)
- Commercial service exports 0 current US$ (1994)
- Transport services 43.7% (1994)
- Computer, communications and other services 10.4% (1994)
Frequently asked questions
- What is getting electricity: procedures in Central African Republic?
- Getting electricity: procedures in Central African Republic was 7 number in 2019, according to the World Bank.
- What is the highest getting electricity: procedures recorded in Central African Republic?
- The highest recorded value was 7 number in 2009.
- What is the lowest getting electricity: procedures recorded in Central African Republic?
- The lowest recorded value was 7 number in 2009.
- How does Central African Republic rank for getting electricity: procedures?
- Central African Republic ranks 9th out of 186 countries with data for 2019.
- Is getting electricity: procedures rising or falling in Central African Republic?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Central African Republic data come from?
- The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.