Getting electricity: Procedures in Montenegro
Montenegro: Getting electricity: Procedures was 7 number in 2019. ▬ Flat
Getting electricity: Procedures in Montenegro, 2009–2019
Source: World Bank. Measured in number.
Analysis
In 2019, getting electricity: procedures in Montenegro stood at 7 number. That is the highest value across all 11 years on record.
That represents a change of unchanged over ten years.
Over the whole period, getting electricity: procedures in Montenegro peaked at 7 number in 2009 and was at its lowest, 7 number, in 2009.
Montenegro ranks 9th of 186 countries on this measure, in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 7 number | 7 number | 7 number | 1 |
| 2010s | 7 number | 7 number | 7 number | 10 |
Countries ranked near Montenegro
- 9 Nigeria 7 number compare
- 9 Angola 7 number compare
- 9 Bolivia 7 number compare
- 9 Canada 7 number compare
- 9 Central African Republic 7 number compare
- 9 Dominican Republic 7 number compare
- 9 Ecuador 7 number compare
- 9 Gabon 7 number compare
- 9 Guinea-Bissau 7 number compare
- 9 Honduras 7 number compare
- 9 Jamaica 7 number compare
- 9 Kyrgyz Republic 7 number compare
- 9 Lao PDR 7 number compare
More private sector data for Montenegro
- Merchandise trade 61.8% (2025)
- Food imports 23.6% (2024)
- Manufactures imports 63.7% (2024)
- Merchandise imports 5.06 billion current US$ (2025)
- Food exports 16.8% (2024)
- Manufactures exports 35.1% (2024)
- Merchandise exports 646.00 million current US$ (2025)
- Commercial service exports 3.07 billion current US$ (2025)
- Transport services 51.7% (2025)
- Computer, communications and other services 38.2% (2025)
Frequently asked questions
- What is getting electricity: procedures in Montenegro?
- Getting electricity: procedures in Montenegro was 7 number in 2019, according to the World Bank.
- What is the highest getting electricity: procedures recorded in Montenegro?
- The highest recorded value was 7 number in 2009.
- What is the lowest getting electricity: procedures recorded in Montenegro?
- The lowest recorded value was 7 number in 2009.
- How does Montenegro rank for getting electricity: procedures?
- Montenegro ranks 9th out of 186 countries with data for 2019.
- Is getting electricity: procedures rising or falling in Montenegro?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Montenegro data come from?
- The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.