Getting electricity: Procedures (number) in Honduras
Honduras: Getting electricity: Procedures was 7 number in 2019. ▬ Flat
Getting electricity: Procedures in Honduras, 2009–2019
Source: World Bank. Measured in number.
Analysis
The most recent figure for getting electricity: procedures in Honduras is 7 number, measured in 2019. That is the highest value across all 11 years on record.
Compared with earlier readings it is unchanged over ten years.
Over the whole period, getting electricity: procedures in Honduras peaked at 7 number in 2009 and was at its lowest, 7 number, in 2009.
Honduras ranks 9th of 189 countries on this measure, in the top 10%.
Getting electricity: Procedures in Honduras, year by year
| Year | number | Change |
|---|---|---|
| 2009 | 7 number | — |
| 2010 | 7 number | +0.0% |
| 2011 | 7 number | +0.0% |
| 2012 | 7 number | +0.0% |
| 2013 | 7 number | +0.0% |
| 2014 | 7 number | +0.0% |
| 2015 | 7 number | +0.0% |
| 2016 | 7 number | +0.0% |
| 2017 | 7 number | +0.0% |
| 2018 | 7 number | +0.0% |
| 2019 | 7 number | +0.0% |
Honduras compared with similar countries
- Honduras's 7 number is above the median for lower middle income countries, which is 5 number, 1.4× the median. (47 countries reporting)
- Honduras's 7 number is above the median for Latin America & Caribbean, which is 5 number, 1.4× the median. (33 countries reporting)
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 7 number | 7 number | 7 number | 1 |
| 2010s | 7 number | 7 number | 7 number | 10 |
Countries ranked near Honduras
- 9 Nigeria 7 number compare
- 9 Angola 7 number compare
- 9 Bolivia 7 number compare
- 9 Canada 7 number compare
- 9 Central African Republic 7 number compare
- 9 Dominican Republic 7 number compare
- 9 Ecuador 7 number compare
- 9 Gabon 7 number compare
- 9 Guinea-Bissau 7 number compare
- 9 Jamaica 7 number compare
- 9 Kosovo 7 number compare
- 9 Kyrgyzstan 7 number compare
- 9 Laos 7 number compare
- 9 Montenegro 7 number compare
- 9 Kosovo (UNSCR 1244) 7 number compare
More private sector data for Honduras
- Merchandise trade 77.4% (2025)
- Food imports 19.5% (2024)
- Manufactures imports 61.5% (2024)
- Merchandise imports 18.64 billion current US$ (2025)
- Food exports 53.5% (2024)
- Manufactures exports 39.1% (2024)
- Merchandise exports 12.00 billion current US$ (2025)
- Merchandise exports (current US$), per capita 1,091 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.3031 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 8.31 % change on previous year (2025)
Frequently asked questions
- What is getting electricity: procedures in Honduras?
- Getting electricity: procedures in Honduras was 7 number in 2019, according to the World Bank.
- What is the highest getting electricity: procedures recorded in Honduras?
- The highest recorded value was 7 number in 2009.
- What is the lowest getting electricity: procedures recorded in Honduras?
- The lowest recorded value was 7 number in 2009.
- How does Honduras rank for getting electricity: procedures?
- Honduras ranks 9th out of 189 countries with data for 2019.
- Is getting electricity: procedures rising or falling in Honduras?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Honduras data come from?
- The figures come from the World Bank, published as part of Getting electricity: Procedures (number). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.