Getting electricity: System average interruption duration index (SAIDI in United Arab Emirates

United Arab Emirates: Getting electricity: System average interruption duration index (SAIDI was 0.25 DB16-20 methodology in 2019. ◆ Volatile

Latest (2019)
0.25 DB16-20 methodology
Change on year
down 3.8%
World rank
113th
of 125 countries
All-time high
0.83 DB16-20 methodology
in 2015
All-time low
0.09 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Getting electricity: System average interruption duration index (SAIDI in United Arab Emirates, 2014–2019

00.20.40.60.82014201620192014: 0.09 DB16-20 methodology2015: 0.83 DB16-20 methodology2016: 0.33 DB16-20 methodology2017: 0.28 DB16-20 methodology2018: 0.26 DB16-20 methodology2019: 0.25 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for getting electricity: system average interruption duration index (saidi in United Arab Emirates is 0.25 DB16-20 methodology, measured in 2019.

The figure is down 3.8% on the previous year and up 177.8% over ten years.

That places United Arab Emirates 113th out of 125 countries with data for 2019, putting it in the bottom quarter.

Countries ranked near United Arab Emirates

  1. 110 Estonia 0.3 DB16-20 methodology compare
  2. 111 United Kingdom 0.28 DB16-20 methodology compare
  3. 112 Taiwan 0.27 DB16-20 methodology compare
  4. 113 Germany 0.25 DB16-20 methodology compare
  5. 115 Uzbekistan 0.22 DB16-20 methodology compare
  6. 116 Finland 0.2 DB16-20 methodology compare
  7. 116 Switzerland 0.2 DB16-20 methodology compare

See the full ranking of 126 places →

More private sector data for United Arab Emirates

All data for United Arab Emirates →

Frequently asked questions

What is getting electricity: system average interruption duration index (saidi in United Arab Emirates?
Getting electricity: system average interruption duration index (saidi in United Arab Emirates was 0.25 DB16-20 methodology in 2019, according to the World Bank.
What is the highest getting electricity: system average interruption duration index (saidi recorded in United Arab Emirates?
The highest recorded value was 0.83 DB16-20 methodology in 2015.
What is the lowest getting electricity: system average interruption duration index (saidi recorded in United Arab Emirates?
The lowest recorded value was 0.09 DB16-20 methodology in 2014.
How does United Arab Emirates rank for getting electricity: system average interruption duration index (saidi?
United Arab Emirates ranks 113th out of 125 countries with data for 2019.
Is getting electricity: system average interruption duration index (saidi rising or falling in United Arab Emirates?
Over the last ten years it is up 177.8%. The long-run trend across the full record is volatile.
Where does this United Arab Emirates data come from?
The figures come from the World Bank, published as part of Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
126 places, 752 data points, 2014–2019
Last refreshed

The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.