Timor-Leste vs Vanuatu: Dealing with construction permits (DB16-20 methodology) - Score

Timor-Leste
55.29
in 2019
Vanuatu
54.57
in 2019
Timor-Leste rank
158th
Vanuatu rank
161st

Dealing with construction permits (DB16-20 methodology) - Score over time

  • Timor-Leste
  • Vanuatu
0204060201420162019

How they compare

Timor-Leste currently reports 55.29 against 54.57 in Vanuatu, a difference of 0.72.

Across all 6 years both countries report, Timor-Leste has been ahead every year.

Timor-Leste ranks 158th and Vanuatu ranks 161st of 188 countries.

Timor-Leste has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits (db16-20 methodology) - score, Timor-Leste or Vanuatu?
Timor-Leste, at 55.29 against 54.57 in Vanuatu as of 2019.
What is the difference in dealing with construction permits (db16-20 methodology) - score between Timor-Leste and Vanuatu?
0.72, with Timor-Leste ahead.
How many years of comparable data are there for Timor-Leste and Vanuatu?
6 years are reported by both, from 2014 to 2019.
How do Timor-Leste and Vanuatu rank globally for dealing with construction permits (db16-20 methodology) - score?
Timor-Leste ranks 158th and Vanuatu ranks 161st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.