Dealing with construction permits (DB16-20 methodology) - Score in Cameroon

Cameroon: Dealing with construction permits (DB16-20 methodology) - Score was 56.45 in 2019. ▲ Rising

Latest (2019)
56.45
Change on year
up 1.2%
World rank
154th
of 191 countries
All-time high
56.45
in 2019
All-time low
52.39
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Cameroon, 2014–2019

02040602014201620192014: 52.42015: 52.52016: 54.22017: 52.82018: 55.82019: 56.5

Source: World Bank.

Analysis

Cameroon recorded 56.45 for dealing with construction permits (db16-20 methodology) - score in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 1.2% on the previous year and up 7.7% over ten years.

That places Cameroon 154th out of 191 countries with data for 2019, putting it in the bottom quarter.

Dealing with construction permits (DB16-20 methodology) - Score in Cameroon, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Cameroon, 2014 to 2019.
Year Value Change
2014 52.39 —
2015 52.51 +0.2%
2016 54.16 +3.1%
2017 52.81 -2.5%
2018 55.77 +5.6%
2019 56.45 +1.2%

Cameroon compared with similar countries

  • Cameroon's 56.45 is below the median for lower middle income countries, which is 64.54, 87% of the median. (47 countries reporting)
  • Cameroon's 56.45 is below the median for Sub-Saharan Africa, which is 62.6, 90% of the median. (48 countries reporting)

Countries ranked near Cameroon

  1. 151 Uruguay 57.54 compare
  2. 152 Cote d'Ivoire 57.41 compare
  3. 153 Barbados 56.64 compare
  4. 155 Argentina 56.44 compare
  5. 156 Moldova 56.24 compare
  6. 157 Czechia 56.21 compare

See the full ranking of 191 places →

More private sector data for Cameroon

All data for Cameroon →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Cameroon?
Dealing with construction permits (db16-20 methodology) - score in Cameroon was 56.45 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Cameroon?
The highest recorded value was 56.45 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Cameroon?
The lowest recorded value was 52.39 in 2014.
How does Cameroon rank for dealing with construction permits (db16-20 methodology) - score?
Cameroon ranks 154th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Cameroon?
Over the last ten years it is up 7.7%. The long-run trend across the full record is rising.
Where does this Cameroon data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Cameroon. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/cameroon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/cameroon/">Dealing with construction permits (DB16-20 methodology) - Score in Cameroon</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.