Dealing with construction permits (DB16-20 methodology) - Score in Cote d'Ivoire

Cote d'Ivoire: Dealing with construction permits (DB16-20 methodology) - Score was 57.41 in 2019. ▲ Rising

Latest (2019)
57.41
Change on year
down 0.2%
World rank
151st
of 188 countries
All-time high
57.5
in 2018
All-time low
34.62
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Cote d'Ivoire, 2014–2019

02040602014201620192014: 34.62015: 352016: 35.82017: 55.62018: 57.52019: 57.4

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in Cote d'Ivoire stood at 57.41.

That represents a change of down 0.2% on the previous year and up 65.8% over ten years.

Cote d'Ivoire ranks 151st of 188 countries on this measure, in the bottom quarter.

Countries ranked near Cote d'Ivoire

  1. 148 Tanzania 57.92 compare
  2. 149 Croatia 57.82 compare
  3. 150 Uruguay 57.54 compare
  4. 152 Barbados 56.64 compare
  5. 153 Cameroon 56.45 compare
  6. 154 Argentina 56.44 compare

See the full ranking of 190 places →

More private sector data for Cote d'Ivoire

All data for Cote d'Ivoire →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Cote d'Ivoire?
Dealing with construction permits (db16-20 methodology) - score in Cote d'Ivoire was 57.41 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Cote d'Ivoire?
The highest recorded value was 57.5 in 2018.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Cote d'Ivoire?
The lowest recorded value was 34.62 in 2014.
How does Cote d'Ivoire rank for dealing with construction permits (db16-20 methodology) - score?
Cote d'Ivoire ranks 151st out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Cote d'Ivoire?
Over the last ten years it is up 65.8%. The long-run trend across the full record is rising.
Where does this Cote d'Ivoire data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.