Dealing with construction permits (DB16-20 methodology) - Score in Uruguay

Uruguay: Dealing with construction permits (DB16-20 methodology) - Score was 57.54 in 2019. ▬ Flat

Latest (2019)
57.54
Change on year
up 0.1%
World rank
151st
of 191 countries
All-time high
57.54
in 2019
All-time low
55.76
in 2015
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Uruguay, 2014–2019

02040602014201620192014: 56.22015: 55.82016: 55.92017: 562018: 57.52019: 57.5

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Uruguay is 57.54, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 0.1% on the previous year and up 2.4% over ten years.

That places Uruguay 151st out of 191 countries with data for 2019, putting it in the bottom quarter.

Dealing with construction permits (DB16-20 methodology) - Score in Uruguay, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Uruguay, 2014 to 2019.
Year Value Change
2014 56.19 —
2015 55.76 -0.8%
2016 55.86 +0.2%
2017 55.97 +0.2%
2018 57.5 +2.7%
2019 57.54 +0.1%

Uruguay compared with similar countries

  • Uruguay's 57.54 is below the median for high income countries, which is 73.56, 78% of the median. (62 countries reporting)
  • Uruguay's 57.54 is below the median for Latin America & Caribbean, which is 65.74, 88% of the median. (33 countries reporting)

Countries ranked near Uruguay

  1. 148 Palestine 58.23 compare
  2. 149 Tanzania 57.92 compare
  3. 150 Croatia 57.82 compare
  4. 152 Cote d'Ivoire 57.41 compare
  5. 153 Barbados 56.64 compare
  6. 154 Cameroon 56.45 compare

See the full ranking of 191 places →

More private sector data for Uruguay

All data for Uruguay →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Uruguay?
Dealing with construction permits (db16-20 methodology) - score in Uruguay was 57.54 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Uruguay?
The highest recorded value was 57.54 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Uruguay?
The lowest recorded value was 55.76 in 2015.
How does Uruguay rank for dealing with construction permits (db16-20 methodology) - score?
Uruguay ranks 151st out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Uruguay?
Over the last ten years it is up 2.4%. The long-run trend across the full record is flat.
Where does this Uruguay data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Uruguay. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/uruguay/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/uruguay/">Dealing with construction permits (DB16-20 methodology) - Score in Uruguay</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.