Dealing with construction permits (DB16-20 methodology) - Score in Comoros

Comoros: Dealing with construction permits (DB16-20 methodology) - Score was 67.98 in 2019. ▬ Flat

Latest (2019)
67.98
Change on year
up 1.8%
World rank
100th
of 188 countries
All-time high
67.98
in 2019
All-time low
66.08
in 2016
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Comoros, 2014–2019

02040602014201620192014: 66.62015: 66.52016: 66.12017: 66.72018: 66.82019: 68

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Comoros is 67.98, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 1.8% on the previous year and up 2.1% over ten years.

That places Comoros 100th out of 188 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Comoros

  1. 97 South Africa 68.32 compare
  2. 98 Laos 68.28 compare
  3. 99 Panama 68.24 compare
  4. 101 Fiji 67.75 compare
  5. 102 Iraq 67.66 compare
  6. 103 Ghana 67.62 compare

See the full ranking of 190 places →

More private sector data for Comoros

All data for Comoros →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Comoros?
Dealing with construction permits (db16-20 methodology) - score in Comoros was 67.98 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Comoros?
The highest recorded value was 67.98 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Comoros?
The lowest recorded value was 66.08 in 2016.
How does Comoros rank for dealing with construction permits (db16-20 methodology) - score?
Comoros ranks 100th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Comoros?
Over the last ten years it is up 2.1%. The long-run trend across the full record is flat.
Where does this Comoros data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.