Dealing with construction permits (DB16-20 methodology) - Score in South Africa

South Africa: Dealing with construction permits (DB16-20 methodology) - Score was 68.32 in 2019. ▬ Flat

Latest (2019)
68.32
Change on year
up 0.1%
World rank
98th
of 191 countries
All-time high
68.35
in 2014
All-time low
68.25
in 2018
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in South Africa, 2014–2019

02040602014201620192014: 68.42015: 68.32016: 68.32017: 68.32018: 68.22019: 68.3

Source: World Bank.

Analysis

South Africa recorded 68.32 for dealing with construction permits (db16-20 methodology) - score in 2019.

The figure is up 0.1% on the previous year and down 0.0% over ten years.

That places South Africa 98th out of 191 countries with data for 2019, putting it in the middle of the range.

Dealing with construction permits (DB16-20 methodology) - Score in South Africa, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in South Africa, 2014 to 2019.
Year Value Change
2014 68.35 —
2015 68.34 -0.0%
2016 68.32 -0.0%
2017 68.27 -0.1%
2018 68.25 -0.0%
2019 68.32 +0.1%

South Africa compared with similar countries

  • South Africa's 68.32 is below the median for upper middle income countries, which is 70.92, 96% of the median. (56 countries reporting)
  • South Africa's 68.32 is above the median for Sub-Saharan Africa, which is 62.6, 1.1× the median. (48 countries reporting)

Countries ranked near South Africa

  1. 95 Burkina Faso 68.68 compare
  2. 96 Eswatini 68.66 compare
  3. 97 Italy 68.33 compare
  4. 99 Laos 68.28 compare
  5. 100 Panama 68.24 compare
  6. 101 Comoros 67.98 compare

See the full ranking of 191 places →

More private sector data for South Africa

All data for South Africa →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in South Africa?
Dealing with construction permits (db16-20 methodology) - score in South Africa was 68.32 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in South Africa?
The highest recorded value was 68.35 in 2014.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in South Africa?
The lowest recorded value was 68.25 in 2018.
How does South Africa rank for dealing with construction permits (db16-20 methodology) - score?
South Africa ranks 98th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in South Africa?
Over the last ten years it is down 0.0%. The long-run trend across the full record is flat.
Where does this South Africa data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in South Africa. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/south-africa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/south-africa/">Dealing with construction permits (DB16-20 methodology) - Score in South Africa</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.