Dealing with construction permits (DB16-20 methodology) - Score in Iran

Iran: Dealing with construction permits (DB16-20 methodology) - Score was 71.18 in 2019. ▬ Flat

Latest (2019)
71.18
Change on year
up 0.6%
World rank
73rd
of 191 countries
All-time high
73.84
in 2016
All-time low
69.28
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Iran, 2014–2019

0204060802014201620192014: 69.32015: 73.22016: 73.82017: 70.32018: 70.82019: 71.2

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Iran is 71.18, measured in 2019.

That represents a change of up 0.6% on the previous year and up 2.7% over ten years.

Iran ranks 73rd of 191 countries on this measure, in the middle of the range.

Dealing with construction permits (DB16-20 methodology) - Score in Iran, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Iran, 2014 to 2019.
Year Value Change
2014 69.28 —
2015 73.25 +5.7%
2016 73.84 +0.8%
2017 70.25 -4.9%
2018 70.78 +0.7%
2019 71.18 +0.6%

Iran compared with similar countries

  • Iran's 71.18 is above the median for upper middle income countries, which is 70.92, 1.0× the median. (56 countries reporting)
  • Iran's 71.18 is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 71.16, 1.0× the median. (23 countries reporting)

Countries ranked near Iran

  1. 70 Jamaica 71.88 compare
  2. 71 Switzerland 71.76 compare
  3. 72 Iceland 71.56 compare
  4. 74 Egypt 71.16 compare
  5. 75 Paraguay 71.11 compare
  6. 76 Marshall Islands 71.09 compare

See the full ranking of 191 places →

More private sector data for Iran

All data for Iran →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Iran?
Dealing with construction permits (db16-20 methodology) - score in Iran was 71.18 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Iran?
The highest recorded value was 73.84 in 2016.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Iran?
The lowest recorded value was 69.28 in 2014.
How does Iran rank for dealing with construction permits (db16-20 methodology) - score?
Iran ranks 73rd out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Iran?
Over the last ten years it is up 2.7%. The long-run trend across the full record is flat.
Where does this Iran data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Iran. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/iran-islamic-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/iran-islamic-rep/">Dealing with construction permits (DB16-20 methodology) - Score in Iran</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.