Dealing with construction permits (DB16-20 methodology) - Score in Trinidad and Tobago
Trinidad and Tobago: Dealing with construction permits (DB16-20 methodology) - Score was 64.13 in 2019. ▬ Flat
Dealing with construction permits (DB16-20 methodology) - Score in Trinidad and Tobago, 2014–2019
Source: World Bank.
Analysis
In 2019, dealing with construction permits (db16-20 methodology) - score in Trinidad and Tobago stood at 64.13.
The figure is up 0.0% over ten years.
That places Trinidad and Tobago 125th out of 188 countries with data for 2019, putting it in the middle of the range.
Countries ranked near Trinidad and Tobago
More private sector data for Trinidad and Tobago
- Merchandise trade 48.6% (2025)
- Food imports 16.4% (2024)
- Manufactures imports 61.9% (2024)
- Merchandise imports 5.80 billion current US$ (2025)
- Food exports 8.2% (2024)
- Manufactures exports 59.1% (2024)
- Merchandise exports 6.82 billion current US$ (2025)
- Commercial service exports 1.26 billion current US$ (2025)
- Transport services 23.3% (2025)
- Computer, communications and other services 34.6% (2025)
Frequently asked questions
- What is dealing with construction permits (db16-20 methodology) - score in Trinidad and Tobago?
- Dealing with construction permits (db16-20 methodology) - score in Trinidad and Tobago was 64.13 in 2019, according to the World Bank.
- What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Trinidad and Tobago?
- The highest recorded value was 64.14 in 2016.
- What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Trinidad and Tobago?
- The lowest recorded value was 64.12 in 2017.
- How does Trinidad and Tobago rank for dealing with construction permits (db16-20 methodology) - score?
- Trinidad and Tobago ranks 125th out of 188 countries with data for 2019.
- Is dealing with construction permits (db16-20 methodology) - score rising or falling in Trinidad and Tobago?
- Over the last ten years it is up 0.0%. The long-run trend across the full record is flat.
- Where does this Trinidad and Tobago data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.