Dealing with construction permits (DB16-20 methodology) - Score in Togo

Togo: Dealing with construction permits (DB16-20 methodology) - Score was 64.12 in 2019. ▲ Rising

Latest (2019)
64.12
Change on year
up 6.0%
World rank
126th
of 188 countries
All-time high
64.12
in 2019
All-time low
39.71
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Togo, 2014–2019

02040602014201620192014: 39.72015: 41.32016: 41.72017: 442018: 60.52019: 64.1

Source: World Bank.

Analysis

Togo recorded 64.12 for dealing with construction permits (db16-20 methodology) - score in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 6.0% on the previous year and up 61.5% over ten years.

That places Togo 126th out of 188 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Togo

  1. 123 Sudan 64.21 compare
  2. 124 Cyprus 64.15 compare
  3. 125 Trinidad and Tobago 64.13 compare
  4. 127 Malawi 63.13 compare
  5. 128 Palau 63.1 compare
  6. 129 Grenada 62.49 compare

See the full ranking of 190 places →

More private sector data for Togo

All data for Togo →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Togo?
Dealing with construction permits (db16-20 methodology) - score in Togo was 64.12 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Togo?
The highest recorded value was 64.12 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Togo?
The lowest recorded value was 39.71 in 2014.
How does Togo rank for dealing with construction permits (db16-20 methodology) - score?
Togo ranks 126th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Togo?
Over the last ten years it is up 61.5%. The long-run trend across the full record is rising.
Where does this Togo data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.