Dealing with construction permits (DB16-20 methodology) - Score in Uganda

Uganda: Dealing with construction permits (DB16-20 methodology) - Score was 66.45 in 2019. ▲ Rising

Latest (2019)
66.45
Change on year
up 1.2%
World rank
112th
of 188 countries
All-time high
66.45
in 2019
All-time low
58.26
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Uganda, 2014–2019

02040602014201620192014: 58.32015: 61.32016: 62.12017: 652018: 65.72019: 66.4

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Uganda is 66.45, measured in 2019. That is the highest value across all 6 years on record.

The figure is up 1.2% on the previous year and up 14.0% over ten years.

That places Uganda 112th out of 188 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Uganda

  1. 109 Indonesia 66.78 compare
  2. 110 Sao Tome and Principe 66.64 compare
  3. 111 Pakistan 66.46 compare
  4. 113 Ecuador 66.42 compare
  5. 114 Suriname 66.33 compare
  6. 115 Guinea 65.85 compare

See the full ranking of 190 places →

More private sector data for Uganda

All data for Uganda →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Uganda?
Dealing with construction permits (db16-20 methodology) - score in Uganda was 66.45 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Uganda?
The highest recorded value was 66.45 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Uganda?
The lowest recorded value was 58.26 in 2014.
How does Uganda rank for dealing with construction permits (db16-20 methodology) - score?
Uganda ranks 112th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Uganda?
Over the last ten years it is up 14.0%. The long-run trend across the full record is rising.
Where does this Uganda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.