Dealing with construction permits (DB16-20 methodology) - Score in Suriname

Suriname: Dealing with construction permits (DB16-20 methodology) - Score was 66.33 in 2019. ▬ Flat

Latest (2019)
66.33
Change on year
down 0.1%
World rank
114th
of 188 countries
All-time high
66.44
in 2015
All-time low
66.33
in 2019
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Suriname, 2014–2019

02040602014201620192014: 66.42015: 66.42016: 66.42017: 66.42018: 66.42019: 66.3

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Suriname is 66.33, measured in 2019. That is the lowest value across all 6 years on record.

The figure is down 0.1% on the previous year and down 0.2% over ten years.

That places Suriname 114th out of 188 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Suriname

  1. 111 Pakistan 66.46 compare
  2. 112 Uganda 66.45 compare
  3. 113 Ecuador 66.42 compare
  4. 115 Guinea 65.85 compare
  5. 116 Antigua and Barbuda 65.74 compare
  6. 117 Guatemala 65.34 compare

See the full ranking of 190 places →

More private sector data for Suriname

All data for Suriname →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Suriname?
Dealing with construction permits (db16-20 methodology) - score in Suriname was 66.33 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Suriname?
The highest recorded value was 66.44 in 2015.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Suriname?
The lowest recorded value was 66.33 in 2019.
How does Suriname rank for dealing with construction permits (db16-20 methodology) - score?
Suriname ranks 114th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Suriname?
Over the last ten years it is down 0.2%. The long-run trend across the full record is flat.
Where does this Suriname data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.