Dealing with construction permits: Time (days) - Score in Saudi Arabia

Saudi Arabia: Dealing with construction permits: Time (days) - Score was 78.67 in 2019. ▲ Rising

Latest (2019)
78.67
Change on year
up 2.1%
World rank
44th
of 188 countries
All-time high
78.67
in 2019
All-time low
63.11
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Saudi Arabia, 2005–2019

0204060802005201220192005: 63.12006: 63.12007: 63.12008: 63.12009: 722010: 75.22011: 76.92012: 76.92013: 76.92014: 76.92015: 76.92016: 76.92017: 77.12018: 77.12019: 78.7

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in Saudi Arabia is 78.67, measured in 2019. That is the highest value across all 15 years on record.

The figure is up 2.1% on the previous year and up 9.2% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Saudi Arabia peaked at 78.67 in 2019 and was at its lowest, 63.11, in 2005.

Saudi Arabia ranks 44th of 188 countries on this measure, in the top quarter.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 64.9 63.11 72.05 5
2010s 76.97 75.22 78.67 10

Countries ranked near Saudi Arabia

  1. 41 Armenia 78.96 compare
  2. 41 Solomon Islands 78.96 compare
  3. 43 Serbia 78.82 compare
  4. 44 Turkey 78.67 compare
  5. 46 Cape Verde 78.39 compare
  6. 47 Botswana 78.1 compare
  7. 47 Montenegro 78.1 compare

See the full ranking of 190 places →

More private sector data for Saudi Arabia

All data for Saudi Arabia →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Saudi Arabia?
Dealing with construction permits: time (days) - score in Saudi Arabia was 78.67 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Saudi Arabia?
The highest recorded value was 78.67 in 2019.
What is the lowest dealing with construction permits: time (days) - score recorded in Saudi Arabia?
The lowest recorded value was 63.11 in 2005.
How does Saudi Arabia rank for dealing with construction permits: time (days) - score?
Saudi Arabia ranks 44th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Saudi Arabia?
Over the last ten years it is up 9.2%. The long-run trend across the full record is rising.
Where does this Saudi Arabia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.