Dealing with construction permits: Time (days) - Score in Malaysia

Malaysia: Dealing with construction permits: Time (days) - Score was 95.68 in 2019. ▲ Rising

Latest (2019)
95.68
Change on year
up 0.3%
World rank
4th
of 188 countries
All-time high
95.68
in 2019
All-time low
25.36
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Malaysia, 2005–2019

204060801002005201220192005: 25.42006: 25.42007: 25.42008: 32.32009: 32.32010: 32.32011: 57.92012: 70.92013: 76.12014: 852015: 852016: 85.32017: 85.32018: 95.42019: 95.7

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in Malaysia is 95.68, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of up 0.3% on the previous year and up 196.4% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Malaysia peaked at 95.68 in 2019 and was at its lowest, 25.36, in 2005.

Malaysia ranks 4th of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 28.13 25.36 32.28 5
2010s 76.89 32.28 95.68 10

Countries ranked near Malaysia

  1. 1 South Korea 99.57 compare
  2. 2 Singapore 97.26 compare
  3. 3 Marshall Islands 96.54 compare
  4. 5 United Arab Emirates 93.8 compare
  5. 6 Samoa 91.07 compare
  6. 7 Morocco 90.78 compare

See the full ranking of 190 places →

More private sector data for Malaysia

All data for Malaysia →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Malaysia?
Dealing with construction permits: time (days) - score in Malaysia was 95.68 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Malaysia?
The highest recorded value was 95.68 in 2019.
What is the lowest dealing with construction permits: time (days) - score recorded in Malaysia?
The lowest recorded value was 25.36 in 2005.
How does Malaysia rank for dealing with construction permits: time (days) - score?
Malaysia ranks 4th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Malaysia?
Over the last ten years it is up 196.4%. The long-run trend across the full record is rising.
Where does this Malaysia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.