Dealing with construction permits: Time (days) - Score in United Arab Emirates

United Arab Emirates: Dealing with construction permits: Time (days) - Score was 93.8 in 2019. ▲ Rising

Latest (2019)
93.8
Change on year
up 0.9%
World rank
5th
of 188 countries
All-time high
94.09
in 2012
All-time low
83.57
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in United Arab Emirates, 2005–2019

0204060801002005201220192005: 83.62006: 83.62007: 83.62008: 83.62009: 93.52010: 93.52011: 93.82012: 94.12013: 94.12014: 94.12015: 94.12016: 92.52017: 92.92018: 92.92019: 93.8

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in United Arab Emirates is 93.8, measured in 2019.

Compared with earlier readings it is up 0.9% on the previous year and up 0.3% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in United Arab Emirates peaked at 94.09 in 2012 and was at its lowest, 83.57, in 2005.

That places United Arab Emirates 5th out of 188 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 85.56 83.57 93.52 5
2010s 93.59 92.51 94.09 10

Countries ranked near United Arab Emirates

  1. 2 Singapore 97.26 compare
  2. 3 Marshall Islands 96.54 compare
  3. 4 Malaysia 95.68 compare
  4. 6 Samoa 91.07 compare
  5. 7 Morocco 90.78 compare
  6. 8 Georgia 89.34 compare

See the full ranking of 190 places →

More private sector data for United Arab Emirates

All data for United Arab Emirates →

Frequently asked questions

What is dealing with construction permits: time (days) - score in United Arab Emirates?
Dealing with construction permits: time (days) - score in United Arab Emirates was 93.8 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in United Arab Emirates?
The highest recorded value was 94.09 in 2012.
What is the lowest dealing with construction permits: time (days) - score recorded in United Arab Emirates?
The lowest recorded value was 83.57 in 2005.
How does United Arab Emirates rank for dealing with construction permits: time (days) - score?
United Arab Emirates ranks 5th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in United Arab Emirates?
Over the last ten years it is up 0.3%. The long-run trend across the full record is rising.
Where does this United Arab Emirates data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.