Dealing with construction permits: Time (days) - Score (Time days) in Marshall Islands

Marshall Islands: Dealing with construction permits: Time (days) - Score was 96.54 in 2019. ▲ Rising

Latest (2019)
96.54
Change on year
unchanged
World rank
3rd
of 191 countries
All-time high
96.54
in 2012
All-time low
92.22
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Marshall Islands, 2005–2019

0204060801002005201220192005: 92.22006: 92.22007: 92.22008: 92.22009: 92.22010: 92.22011: 92.22012: 96.52013: 96.52014: 96.52015: 96.52016: 96.52017: 96.52018: 96.52019: 96.5

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits: time (days) - score in Marshall Islands is 96.54, measured in 2019. That is the highest value across all 15 years on record.

That represents a change of up 4.7% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Marshall Islands peaked at 96.54 in 2012 and was at its lowest, 92.22, in 2005.

That places Marshall Islands 3rd out of 191 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time (days) - Score in Marshall Islands, year by year

Annual values for Dealing with construction permits: Time (days) - Score in Marshall Islands, 2005 to 2019.
Year Value Change
2005 92.22 —
2006 92.22 +0.0%
2007 92.22 +0.0%
2008 92.22 +0.0%
2009 92.22 +0.0%
2010 92.22 +0.0%
2011 92.22 +0.0%
2012 96.54 +4.7%
2013 96.54 +0.0%
2014 96.54 +0.0%
2015 96.54 +0.0%
2016 96.54 +0.0%
2017 96.54 +0.0%
2018 96.54 +0.0%
2019 96.54 +0.0%

Marshall Islands compared with similar countries

  • Marshall Islands's 96.54 is above the median for upper middle income countries, which is 69.6, 1.4× the median. (56 countries reporting)
  • Marshall Islands's 96.54 is above the median for East Asia & Pacific, which is 77.62, 1.2× the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 92.22 92.22 92.22 5
2010s 95.68 92.22 96.54 10

Countries ranked near Marshall Islands

  1. 1 South Korea 99.57 compare
  2. 2 Singapore 97.26 compare
  3. 4 Malaysia 95.68 compare
  4. 5 United Arab Emirates 93.8 compare
  5. 6 Samoa 91.07 compare

See the full ranking of 191 places →

More private sector data for Marshall Islands

All data for Marshall Islands →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Marshall Islands?
Dealing with construction permits: time (days) - score in Marshall Islands was 96.54 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Marshall Islands?
The highest recorded value was 96.54 in 2012.
What is the lowest dealing with construction permits: time (days) - score recorded in Marshall Islands?
The lowest recorded value was 92.22 in 2005.
How does Marshall Islands rank for dealing with construction permits: time (days) - score?
Marshall Islands ranks 3rd out of 191 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Marshall Islands?
Over the last ten years it is up 4.7%. The long-run trend across the full record is rising.
Where does this Marshall Islands data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time (days) - Score in Marshall Islands. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/marshall-islands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days-score/marshall-islands/">Dealing with construction permits: Time (days) - Score in Marshall Islands</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 2,794 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.