Getting electricity: System average interruption duration index (SAIDI in Philippines

Philippines: Getting electricity: System average interruption duration index (SAIDI was 3.57 DB16-20 methodology in 2019. ▼ Falling

Latest (2019)
3.57 DB16-20 methodology
Change on year
down 8.7%
World rank
49th
of 125 countries
All-time high
6.6 DB16-20 methodology
in 2014
All-time low
3.57 DB16-20 methodology
in 2019
Years of data
6
2014–2019

Getting electricity: System average interruption duration index (SAIDI in Philippines, 2014–2019

02462014201620192014: 6.6 DB16-20 methodology2015: 5.8 DB16-20 methodology2016: 4.2 DB16-20 methodology2017: 4.6 DB16-20 methodology2018: 3.9 DB16-20 methodology2019: 3.6 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

Philippines recorded 3.57 DB16-20 methodology for getting electricity: system average interruption duration index (saidi in 2019. That is the lowest value across all 6 years on record.

That represents a change of down 8.7% on the previous year and down 45.9% over ten years.

That places Philippines 49th out of 125 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Philippines

  1. 46 Serbia 3.85 DB16-20 methodology compare
  2. 47 New Zealand 3.77 DB16-20 methodology compare
  3. 48 India 3.72 DB16-20 methodology compare
  4. 50 Croatia 3.3 DB16-20 methodology compare
  5. 51 Barbados 3.16 DB16-20 methodology compare
  6. 52 Solomon Islands 3.1 DB16-20 methodology compare

See the full ranking of 126 places →

More private sector data for Philippines

All data for Philippines →

Frequently asked questions

What is getting electricity: system average interruption duration index (saidi in Philippines?
Getting electricity: system average interruption duration index (saidi in Philippines was 3.57 DB16-20 methodology in 2019, according to the World Bank.
What is the highest getting electricity: system average interruption duration index (saidi recorded in Philippines?
The highest recorded value was 6.6 DB16-20 methodology in 2014.
What is the lowest getting electricity: system average interruption duration index (saidi recorded in Philippines?
The lowest recorded value was 3.57 DB16-20 methodology in 2019.
How does Philippines rank for getting electricity: system average interruption duration index (saidi?
Philippines ranks 49th out of 125 countries with data for 2019.
Is getting electricity: system average interruption duration index (saidi rising or falling in Philippines?
Over the last ten years it is down 45.9%. The long-run trend across the full record is falling.
Where does this Philippines data come from?
The figures come from the World Bank, published as part of Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
126 places, 752 data points, 2014–2019
Last refreshed

The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.