Dealing with construction permits: Cost (% of Warehouse value) - Score in Tanzania, United Republic of

Tanzania, United Republic of: Dealing with construction permits: Cost (% of Warehouse value) - Score was 73.2% in 2019. ▲ Rising

Latest (2019)
73.2%
Change on year
up 4.7%
World rank
135th
of 191 countries
All-time high
73.2%
in 2019
All-time low
0.0%
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Cost (% of Warehouse value) - Score in Tanzania, United Republic of, 2005–2019

0204060802005201220192005: 02006: 5.52007: 21.62008: 30.82009: 38.62010: 48.42011: 52.32012: 37.92013: 462014: 44.52015: 60.42016: 63.22017: 67.22018: 69.92019: 73.2

Source: World Bank.

Analysis

In 2019, dealing with construction permits: cost (% of warehouse value) - score in Tanzania, United Republic of stood at 73.2%. That is the highest value across all 15 years on record.

That represents a change of up 4.7% on the previous year and up 89.5% over ten years.

Over the whole period, dealing with construction permits: cost (% of warehouse value) - score in Tanzania, United Republic of peaked at 73.2% in 2019 and was at its lowest, 0.0%, in 2005.

Tanzania, United Republic of ranks 135th of 191 countries on this measure, in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Cost (% of Warehouse value) - Score in Tanzania, United Republic of, year by year

Annual values for Dealing with construction permits: Cost (% of Warehouse value) - Score in Tanzania, United Republic of, 2005 to 2019.
Year Value Change
2005 0.0%
2006 5.5%
2007 21.6% +290.6%
2008 30.8% +42.7%
2009 38.6% +25.3%
2010 48.4% +25.4%
2011 52.3% +7.9%
2012 37.9% -27.5%
2013 46.0% +21.4%
2014 44.5% -3.2%
2015 60.4% +35.6%
2016 63.2% +4.7%
2017 67.2% +6.4%
2018 69.9% +4.0%
2019 73.2% +4.7%

Averages by decade

DecadeAverage LowestHighest Years
2000s 19.3% 0.0% 38.6% 5
2010s 56.3% 37.9% 73.2% 10

Countries ranked near Tanzania, United Republic of

  1. 132 Montenegro 75.6% compare
  2. 133 Kosovo 74.0% compare
  3. 133 Kosovo (UNSCR 1244) 74.0% compare
  4. 136 Kuwait 72.6% compare
  5. 137 Tonga 71.7% compare
  6. 138 Nicaragua 71.3% compare

See the full ranking of 191 places →

More private sector data for Tanzania, United Republic of

All data for Tanzania, United Republic of →

Frequently asked questions

What is dealing with construction permits: cost (% of warehouse value) - score in Tanzania, United Republic of?
Dealing with construction permits: cost (% of warehouse value) - score in Tanzania, United Republic of was 73.2% in 2019, according to the World Bank.
What is the highest dealing with construction permits: cost (% of warehouse value) - score recorded in Tanzania, United Republic of?
The highest recorded value was 73.2% in 2019.
What is the lowest dealing with construction permits: cost (% of warehouse value) - score recorded in Tanzania, United Republic of?
The lowest recorded value was 0.0% in 2005.
How does Tanzania, United Republic of rank for dealing with construction permits: cost (% of warehouse value) - score?
Tanzania, United Republic of ranks 135th out of 191 countries with data for 2019.
Is dealing with construction permits: cost (% of warehouse value) - score rising or falling in Tanzania, United Republic of?
Over the last ten years it is up 89.5%. The long-run trend across the full record is rising.
Where does this Tanzania, United Republic of data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Cost (% of Warehouse value) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Cost (% of Warehouse value) - Score in Tanzania, United Republic of. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value-score/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-cost-percent-of-warehouse-value-score/tanzania/">Dealing with construction permits: Cost (% of Warehouse value) - Score in Tanzania, United Republic of</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 2,794 data points, 2005–2019
Last refreshed

The score for cost benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.