Dealing with construction permits (DB16-20 methodology) - Score in Bahrain

Bahrain: Dealing with construction permits (DB16-20 methodology) - Score was 83.13 in 2019. ▲ Rising

Latest (2019)
83.13
Change on year
up 13.2%
World rank
17th
of 191 countries
All-time high
83.13
in 2019
All-time low
72.93
in 2016
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Bahrain, 2014–2019

0204060802014201620192014: 74.52015: 74.62016: 72.92017: 73.72018: 73.42019: 83.1

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Bahrain is 83.13, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 13.2% on the previous year and up 11.5% over ten years.

That places Bahrain 17th out of 191 countries with data for 2019, putting it in the top 10%.

Dealing with construction permits (DB16-20 methodology) - Score in Bahrain, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Bahrain, 2014 to 2019.
Year Value Change
2014 74.53 —
2015 74.58 +0.1%
2016 72.93 -2.2%
2017 73.73 +1.1%
2018 73.4 -0.4%
2019 83.13 +13.2%

Bahrain compared with similar countries

  • Bahrain's 83.13 is above the median for high income countries, which is 73.56, 1.1× the median. (62 countries reporting)
  • Bahrain's 83.13 is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 71.16, 1.2× the median. (23 countries reporting)

Countries ranked near Bahrain

  1. 14 Luxembourg 83.87 compare
  2. 15 North Macedonia 83.55 compare
  3. 16 Morocco 83.25 compare
  4. 18 Japan 83.09 compare
  5. 19 Estonia 82.55 compare
  6. 20 Ukraine 81.14 compare

See the full ranking of 191 places →

More private sector data for Bahrain

All data for Bahrain →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Bahrain?
Dealing with construction permits (db16-20 methodology) - score in Bahrain was 83.13 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Bahrain?
The highest recorded value was 83.13 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Bahrain?
The lowest recorded value was 72.93 in 2016.
How does Bahrain rank for dealing with construction permits (db16-20 methodology) - score?
Bahrain ranks 17th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Bahrain?
Over the last ten years it is up 11.5%. The long-run trend across the full record is rising.
Where does this Bahrain data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Bahrain. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/bahrain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/bahrain/">Dealing with construction permits (DB16-20 methodology) - Score in Bahrain</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.