Dealing with construction permits (DB16-20 methodology) - Score in Morocco

Morocco: Dealing with construction permits (DB16-20 methodology) - Score was 83.25 in 2019. ▬ Flat

Latest (2019)
83.25
Change on year
up 0.9%
World rank
16th
of 188 countries
All-time high
83.25
in 2019
All-time low
81.84
in 2015
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Morocco, 2014–2019

0204060802014201620192014: 82.62015: 81.82016: 82.32017: 82.32018: 82.52019: 83.2

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Morocco is 83.25, measured in 2019. That is the highest value across all 6 years on record.

The figure is up 0.9% on the previous year and up 0.8% over ten years.

Morocco ranks 16th of 188 countries on this measure, in the top 10%.

Countries ranked near Morocco

  1. 13 Qatar 84.16 compare
  2. 14 Luxembourg 83.87 compare
  3. 15 North Macedonia 83.55 compare
  4. 17 Bahrain 83.13 compare
  5. 18 Japan 83.09 compare
  6. 19 Estonia 82.55 compare

See the full ranking of 190 places →

More private sector data for Morocco

All data for Morocco →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Morocco?
Dealing with construction permits (db16-20 methodology) - score in Morocco was 83.25 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Morocco?
The highest recorded value was 83.25 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Morocco?
The lowest recorded value was 81.84 in 2015.
How does Morocco rank for dealing with construction permits (db16-20 methodology) - score?
Morocco ranks 16th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Morocco?
Over the last ten years it is up 0.8%. The long-run trend across the full record is flat.
Where does this Morocco data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.