Dealing with construction permits (DB16-20 methodology) - Score in Chad

Chad: Dealing with construction permits (DB16-20 methodology) - Score was 47.24 in 2019. ▼ Falling

Latest (2019)
47.24
Change on year
up 1.0%
World rank
172nd
of 188 countries
All-time high
50.44
in 2015
All-time low
46.77
in 2018
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Chad, 2014–2019

02040602014201620192014: 50.42015: 50.42016: 492017: 46.92018: 46.82019: 47.2

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in Chad stood at 47.24.

Compared with earlier readings it is up 1.0% on the previous year and down 6.3% over ten years.

Chad ranks 172nd of 188 countries on this measure, in the bottom quarter.

Countries ranked near Chad

  1. 169 South Sudan 50.51 compare
  2. 170 Solomon Islands 49.47 compare
  3. 171 Bosnia and Herzegovina 48.57 compare
  4. 173 Venezuela 46.45 compare
  5. 174 Nicaragua 46.33 compare
  6. 175 Guinea-Bissau 45.24 compare

See the full ranking of 190 places →

More private sector data for Chad

All data for Chad →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Chad?
Dealing with construction permits (db16-20 methodology) - score in Chad was 47.24 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Chad?
The highest recorded value was 50.44 in 2015.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Chad?
The lowest recorded value was 46.77 in 2018.
How does Chad rank for dealing with construction permits (db16-20 methodology) - score?
Chad ranks 172nd out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Chad?
Over the last ten years it is down 6.3%. The long-run trend across the full record is falling.
Where does this Chad data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.