Dealing with construction permits (DB16-20 methodology) - Score in South Sudan

South Sudan: Dealing with construction permits (DB16-20 methodology) - Score was 50.51 in 2019. ▼ Falling

Latest (2019)
50.51
Change on year
up 8.9%
World rank
169th
of 188 countries
All-time high
52.2
in 2014
All-time low
36.61
in 2017
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in South Sudan, 2014–2019

02040602014201620192014: 52.22015: 49.62016: 492017: 36.62018: 46.42019: 50.5

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in South Sudan stood at 50.51.

Compared with earlier readings it is up 8.9% on the previous year and down 3.2% over ten years.

South Sudan ranks 169th of 188 countries on this measure, in the bottom quarter.

Countries ranked near South Sudan

  1. 166 El Salvador 52.35 compare
  2. 167 Kiribati 52.2 compare
  3. 168 Brazil 51.92 compare
  4. 170 Solomon Islands 49.47 compare
  5. 171 Bosnia and Herzegovina 48.57 compare
  6. 172 Chad 47.24 compare

See the full ranking of 190 places →

More private sector data for South Sudan

All data for South Sudan →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in South Sudan?
Dealing with construction permits (db16-20 methodology) - score in South Sudan was 50.51 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in South Sudan?
The highest recorded value was 52.2 in 2014.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in South Sudan?
The lowest recorded value was 36.61 in 2017.
How does South Sudan rank for dealing with construction permits (db16-20 methodology) - score?
South Sudan ranks 169th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in South Sudan?
Over the last ten years it is down 3.2%. The long-run trend across the full record is falling.
Where does this South Sudan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.