Dealing with construction permits (DB16-20 methodology) - Score in El Salvador

El Salvador: Dealing with construction permits (DB16-20 methodology) - Score was 52.35 in 2019. ▼ Falling

Latest (2019)
52.35
Change on year
down 0.7%
World rank
169th
of 191 countries
All-time high
61.86
in 2015
All-time low
50.38
in 2017
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in El Salvador, 2014–2019

02040602014201620192014: 61.72015: 61.92016: 60.12017: 50.42018: 52.72019: 52.3

Source: World Bank.

Analysis

El Salvador recorded 52.35 for dealing with construction permits (db16-20 methodology) - score in 2019.

Compared with earlier readings it is down 0.7% on the previous year and down 15.2% over ten years.

El Salvador ranks 169th of 191 countries on this measure, in the bottom quarter.

Dealing with construction permits (DB16-20 methodology) - Score in El Salvador, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in El Salvador, 2014 to 2019.
Year Value Change
2014 61.7 —
2015 61.86 +0.2%
2016 60.07 -2.9%
2017 50.38 -16.1%
2018 52.69 +4.6%
2019 52.35 -0.7%

El Salvador compared with similar countries

  • El Salvador's 52.35 is below the median for upper middle income countries, which is 70.92, 74% of the median. (56 countries reporting)
  • El Salvador's 52.35 is below the median for Latin America & Caribbean, which is 65.74, 80% of the median. (33 countries reporting)

Countries ranked near El Salvador

  1. 166 Lesotho 52.95 compare
  2. 167 Albania 52.68 compare
  3. 168 Guyana 52.52 compare
  4. 170 Kiribati 52.2 compare
  5. 171 Brazil 51.92 compare
  6. 172 South Sudan 50.51 compare

See the full ranking of 191 places →

More private sector data for El Salvador

All data for El Salvador →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in El Salvador?
Dealing with construction permits (db16-20 methodology) - score in El Salvador was 52.35 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in El Salvador?
The highest recorded value was 61.86 in 2015.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in El Salvador?
The lowest recorded value was 50.38 in 2017.
How does El Salvador rank for dealing with construction permits (db16-20 methodology) - score?
El Salvador ranks 169th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in El Salvador?
Over the last ten years it is down 15.2%. The long-run trend across the full record is falling.
Where does this El Salvador data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in El Salvador. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/el-salvador/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/el-salvador/">Dealing with construction permits (DB16-20 methodology) - Score in El Salvador</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.