Dealing with construction permits (DB16-20 methodology) - Score in Lebanon

Lebanon: Dealing with construction permits (DB16-20 methodology) - Score was 53.72 in 2019. ▬ Flat

Latest (2019)
53.72
Change on year
down 0.9%
World rank
162nd
of 188 countries
All-time high
55.15
in 2014
All-time low
53.68
in 2017
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Lebanon, 2014–2019

02040602014201620192014: 55.22015: 55.12016: 53.92017: 53.72018: 54.22019: 53.7

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in Lebanon stood at 53.72.

Compared with earlier readings it is down 0.9% on the previous year and down 2.6% over ten years.

Lebanon ranks 162nd of 188 countries on this measure, in the bottom quarter.

Countries ranked near Lebanon

  1. 159 Burundi 55.01 compare
  2. 160 Equatorial Guinea 55.01 compare
  3. 161 Vanuatu 54.57 compare
  4. 163 Lesotho 52.95 compare
  5. 164 Albania 52.68 compare
  6. 165 Guyana 52.52 compare

See the full ranking of 190 places →

More private sector data for Lebanon

All data for Lebanon →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Lebanon?
Dealing with construction permits (db16-20 methodology) - score in Lebanon was 53.72 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Lebanon?
The highest recorded value was 55.15 in 2014.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Lebanon?
The lowest recorded value was 53.68 in 2017.
How does Lebanon rank for dealing with construction permits (db16-20 methodology) - score?
Lebanon ranks 162nd out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Lebanon?
Over the last ten years it is down 2.6%. The long-run trend across the full record is flat.
Where does this Lebanon data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.