Dealing with construction permits (DB16-20 methodology) - Score in Equatorial Guinea
Equatorial Guinea: Dealing with construction permits (DB16-20 methodology) - Score was 55.01 in 2019. ▬ Flat
Dealing with construction permits (DB16-20 methodology) - Score in Equatorial Guinea, 2014–2019
Source: World Bank.
Analysis
The most recent figure for dealing with construction permits (db16-20 methodology) - score in Equatorial Guinea is 55.01, measured in 2019.
That represents a change of down 0.1% over ten years.
That places Equatorial Guinea 160th out of 188 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Equatorial Guinea
More private sector data for Equatorial Guinea
- Merchandise trade 33.5% (2025)
- Food imports 31.8% (1983)
- Manufactures imports 64.2% (1983)
- Merchandise imports 1.70 billion current US$ (2025)
- Food exports 57.9% (1983)
- Manufactures exports 4.0% (1983)
- Merchandise exports 2.60 billion current US$ (2025)
- Commercial service exports 4.88 million current US$ (1996)
- Commercial service imports 184.58 million current US$ (1996)
- Merchandise imports from economies in the Arab World 2.9% (2023)
Frequently asked questions
- What is dealing with construction permits (db16-20 methodology) - score in Equatorial Guinea?
- Dealing with construction permits (db16-20 methodology) - score in Equatorial Guinea was 55.01 in 2019, according to the World Bank.
- What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Equatorial Guinea?
- The highest recorded value was 55.07 in 2014.
- What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Equatorial Guinea?
- The lowest recorded value was 54.95 in 2017.
- How does Equatorial Guinea rank for dealing with construction permits (db16-20 methodology) - score?
- Equatorial Guinea ranks 160th out of 188 countries with data for 2019.
- Is dealing with construction permits (db16-20 methodology) - score rising or falling in Equatorial Guinea?
- Over the last ten years it is down 0.1%. The long-run trend across the full record is flat.
- Where does this Equatorial Guinea data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.