Dealing with construction permits (DB16-20 methodology) - Score in Mongolia

Mongolia: Dealing with construction permits (DB16-20 methodology) - Score was 78.21 in 2019. ▬ Flat

Latest (2019)
78.21
Change on year
up 0.0%
World rank
29th
of 191 countries
All-time high
78.23
in 2014
All-time low
78.19
in 2015
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Mongolia, 2014–2019

0204060802014201620192014: 78.22015: 78.22016: 78.22017: 78.22018: 78.22019: 78.2

Source: World Bank.

Analysis

Mongolia recorded 78.21 for dealing with construction permits (db16-20 methodology) - score in 2019.

Compared with earlier readings it is down 0.0% over ten years.

That places Mongolia 29th out of 191 countries with data for 2019, putting it in the top quarter.

Dealing with construction permits (DB16-20 methodology) - Score in Mongolia, year by year

Annual values for Dealing with construction permits (DB16-20 methodology) - Score in Mongolia, 2014 to 2019.
Year Value Change
2014 78.23 —
2015 78.19 -0.1%
2016 78.19 +0.0%
2017 78.19 +0.0%
2018 78.19 -0.0%
2019 78.21 +0.0%

Mongolia compared with similar countries

  • Mongolia's 78.21 is above the median for upper middle income countries, which is 70.92, 1.1× the median. (56 countries reporting)
  • Mongolia's 78.21 is above the median for East Asia & Pacific, which is 71.5, 1.1× the median. (28 countries reporting)

Countries ranked near Mongolia

  1. 26 Russia 78.9 compare
  2. 27 India 78.66 compare
  3. 28 Saudi Arabia 78.35 compare
  4. 30 Germany 78.2 compare
  5. 31 Sweden 78.05 compare
  6. 32 Tunisia 77.38 compare

See the full ranking of 191 places →

More private sector data for Mongolia

All data for Mongolia →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Mongolia?
Dealing with construction permits (db16-20 methodology) - score in Mongolia was 78.21 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Mongolia?
The highest recorded value was 78.23 in 2014.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Mongolia?
The lowest recorded value was 78.19 in 2015.
How does Mongolia rank for dealing with construction permits (db16-20 methodology) - score?
Mongolia ranks 29th out of 191 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Mongolia?
Over the last ten years it is down 0.0%. The long-run trend across the full record is flat.
Where does this Mongolia data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits (DB16-20 methodology) - Score in Mongolia. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/mongolia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-db16-20-methodology-score/mongolia/">Dealing with construction permits (DB16-20 methodology) - Score in Mongolia</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.