Dealing with construction permits (DB16-20 methodology) - Score in Mozambique

Mozambique: Dealing with construction permits (DB16-20 methodology) - Score was 73.19 in 2019. ▬ Flat

Latest (2019)
73.19
Change on year
up 0.9%
World rank
61st
of 188 countries
All-time high
73.19
in 2019
All-time low
71.02
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Mozambique, 2014–2019

0204060802014201620192014: 712015: 732016: 732017: 72.82018: 72.62019: 73.2

Source: World Bank.

Analysis

In 2019, dealing with construction permits (db16-20 methodology) - score in Mozambique stood at 73.19. That is the highest value across all 6 years on record.

Compared with earlier readings it is up 0.9% on the previous year and up 3.1% over ten years.

Mozambique ranks 61st of 188 countries on this measure, in the middle of the range.

Countries ranked near Mozambique

  1. 58 St. Kitts and Nevis 73.48 compare
  2. 59 Azerbaijan 73.36 compare
  3. 60 Portugal 73.23 compare
  4. 62 Armenia 73.05 compare
  5. 63 Maldives 72.99 compare
  6. 64 Canada 72.98 compare

See the full ranking of 190 places →

More private sector data for Mozambique

All data for Mozambique →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Mozambique?
Dealing with construction permits (db16-20 methodology) - score in Mozambique was 73.19 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Mozambique?
The highest recorded value was 73.19 in 2019.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Mozambique?
The lowest recorded value was 71.02 in 2014.
How does Mozambique rank for dealing with construction permits (db16-20 methodology) - score?
Mozambique ranks 61st out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Mozambique?
Over the last ten years it is up 3.1%. The long-run trend across the full record is flat.
Where does this Mozambique data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.