Dealing with construction permits (DB16-20 methodology) - Score in Grenada

Grenada: Dealing with construction permits (DB16-20 methodology) - Score was 62.49 in 2019. ▬ Flat

Latest (2019)
62.49
Change on year
down 0.1%
World rank
129th
of 188 countries
All-time high
62.53
in 2018
All-time low
61.85
in 2014
Years of data
6
2014–2019

Dealing with construction permits (DB16-20 methodology) - Score in Grenada, 2014–2019

02040602014201620192014: 61.82015: 622016: 62.22017: 62.32018: 62.52019: 62.5

Source: World Bank.

Analysis

The most recent figure for dealing with construction permits (db16-20 methodology) - score in Grenada is 62.49, measured in 2019.

Compared with earlier readings it is down 0.1% on the previous year and up 1.0% over ten years.

That places Grenada 129th out of 188 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Grenada

  1. 126 Togo 64.12 compare
  2. 127 Malawi 63.13 compare
  3. 128 Palau 63.1 compare
  4. 130 Senegal 62.06 compare
  5. 131 Uzbekistan 61.68 compare
  6. 132 Mali 61.43 compare

See the full ranking of 190 places →

More private sector data for Grenada

All data for Grenada →

Frequently asked questions

What is dealing with construction permits (db16-20 methodology) - score in Grenada?
Dealing with construction permits (db16-20 methodology) - score in Grenada was 62.49 in 2019, according to the World Bank.
What is the highest dealing with construction permits (db16-20 methodology) - score recorded in Grenada?
The highest recorded value was 62.53 in 2018.
What is the lowest dealing with construction permits (db16-20 methodology) - score recorded in Grenada?
The lowest recorded value was 61.85 in 2014.
How does Grenada rank for dealing with construction permits (db16-20 methodology) - score?
Grenada ranks 129th out of 188 countries with data for 2019.
Is dealing with construction permits (db16-20 methodology) - score rising or falling in Grenada?
Over the last ten years it is up 1.0%. The long-run trend across the full record is flat.
Where does this Grenada data come from?
The figures come from the World Bank, published as part of Dealing with construction permits (DB16-20 methodology) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 1,139 data points, 2014–2019
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB16-20 studies.