Dealing with construction permits: Quality control before construction in Botswana
Botswana: Dealing with construction permits: Quality control before construction was 0 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control before construction in Botswana, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control before construction in Botswana stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.
That places Botswana 161st out of 183 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Botswana
- 161 Antigua and Barbuda 0 DB16-20 methodology compare
- 161 Austria 0 DB16-20 methodology compare
- 161 Barbados 0 DB16-20 methodology compare
- 161 Burundi 0 DB16-20 methodology compare
- 161 Chad 0 DB16-20 methodology compare
- 161 Croatia 0 DB16-20 methodology compare
- 161 Czechia 0 DB16-20 methodology compare
- 161 Equatorial Guinea 0 DB16-20 methodology compare
- 161 Guyana 0 DB16-20 methodology compare
- 161 Italy 0 DB16-20 methodology compare
- 161 Korea, Rep. 0 DB16-20 methodology compare
- 161 Marshall Islands 0 DB16-20 methodology compare
- 161 Micronesia, Fed. Sts. 0 DB16-20 methodology compare
- 161 Palau 0 DB16-20 methodology compare
- 161 Sao Tome and Principe 0 DB16-20 methodology compare
- 161 Seychelles 0 DB16-20 methodology compare
- 161 Slovak Republic 0 DB16-20 methodology compare
- 161 Sri Lanka 0 DB16-20 methodology compare
- 161 Timor-Leste 0 DB16-20 methodology compare
- 161 Ukraine 0 DB16-20 methodology compare
- 161 Vanuatu 0 DB16-20 methodology compare
- 161 Zimbabwe 0 DB16-20 methodology compare
More private sector data for Botswana
- Merchandise trade 57.8% (2025)
- Food imports 16.2% (2023)
- Manufactures imports 61.8% (2023)
- Merchandise imports 6.39 billion current US$ (2025)
- Food exports 1.9% (2023)
- Manufactures exports 86.3% (2023)
- Merchandise exports 5.12 billion current US$ (2025)
- Commercial service exports 934.97 million current US$ (2024)
- Transport services 26.7% (2024)
- Computer, communications and other services 61.2% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control before construction in Botswana?
- Dealing with construction permits: quality control before construction in Botswana was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control before construction recorded in Botswana?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control before construction recorded in Botswana?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Botswana rank for dealing with construction permits: quality control before construction?
- Botswana ranks 161st out of 183 countries with data for 2019.
- Where does this Botswana data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.