Dealing with construction permits: Quality control before construction in East Timor

East Timor: Dealing with construction permits: Quality control before construction was 0 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
0 DB16-20 methodology
World rank
161st
of 183 countries
All-time high
0 DB16-20 methodology
in 2014
All-time low
0 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control before construction in East Timor, 2014–2019

00.20.40.60.812014201620192014: 0 DB16-20 methodology2015: 0 DB16-20 methodology2016: 0 DB16-20 methodology2017: 0 DB16-20 methodology2018: 0 DB16-20 methodology2019: 0 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

In 2019, dealing with construction permits: quality control before construction in East Timor stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.

East Timor ranks 161st of 183 countries on this measure, in the bottom quarter.

Countries ranked near East Timor

  1. 161 Antigua and Barbuda 0 DB16-20 methodology compare
  2. 161 Austria 0 DB16-20 methodology compare
  3. 161 Barbados 0 DB16-20 methodology compare
  4. 161 Botswana 0 DB16-20 methodology compare
  5. 161 Burundi 0 DB16-20 methodology compare
  6. 161 Chad 0 DB16-20 methodology compare
  7. 161 Croatia 0 DB16-20 methodology compare
  8. 161 Czechia 0 DB16-20 methodology compare
  9. 161 Equatorial Guinea 0 DB16-20 methodology compare
  10. 161 Guyana 0 DB16-20 methodology compare
  11. 161 Italy 0 DB16-20 methodology compare
  12. 161 South Korea 0 DB16-20 methodology compare
  13. 161 Marshall Islands 0 DB16-20 methodology compare
  14. 161 Micronesia (country) 0 DB16-20 methodology compare
  15. 161 Palau 0 DB16-20 methodology compare
  16. 161 Sao Tome and Principe 0 DB16-20 methodology compare
  17. 161 Seychelles 0 DB16-20 methodology compare
  18. 161 Slovakia 0 DB16-20 methodology compare
  19. 161 Sri Lanka 0 DB16-20 methodology compare
  20. 161 Ukraine 0 DB16-20 methodology compare
  21. 161 Vanuatu 0 DB16-20 methodology compare
  22. 161 Zimbabwe 0 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for East Timor

All data for East Timor →

Frequently asked questions

What is dealing with construction permits: quality control before construction in East Timor?
Dealing with construction permits: quality control before construction in East Timor was 0 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control before construction recorded in East Timor?
The highest recorded value was 0 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control before construction recorded in East Timor?
The lowest recorded value was 0 DB16-20 methodology in 2014.
How does East Timor rank for dealing with construction permits: quality control before construction?
East Timor ranks 161st out of 183 countries with data for 2019.
Where does this East Timor data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.