Dealing with construction permits: Quality control before construction in Equatorial Guinea
Equatorial Guinea: Dealing with construction permits: Quality control before construction was 0 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control before construction in Equatorial Guinea, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control before construction in Equatorial Guinea stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.
That places Equatorial Guinea 161st out of 183 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Equatorial Guinea
- 161 Antigua and Barbuda 0 DB16-20 methodology compare
- 161 Austria 0 DB16-20 methodology compare
- 161 Barbados 0 DB16-20 methodology compare
- 161 Botswana 0 DB16-20 methodology compare
- 161 Burundi 0 DB16-20 methodology compare
- 161 Chad 0 DB16-20 methodology compare
- 161 Croatia 0 DB16-20 methodology compare
- 161 Czechia 0 DB16-20 methodology compare
- 161 Guyana 0 DB16-20 methodology compare
- 161 Italy 0 DB16-20 methodology compare
- 161 South Korea 0 DB16-20 methodology compare
- 161 Marshall Islands 0 DB16-20 methodology compare
- 161 Micronesia (country) 0 DB16-20 methodology compare
- 161 Palau 0 DB16-20 methodology compare
- 161 Sao Tome and Principe 0 DB16-20 methodology compare
- 161 Seychelles 0 DB16-20 methodology compare
- 161 Slovakia 0 DB16-20 methodology compare
- 161 Sri Lanka 0 DB16-20 methodology compare
- 161 East Timor 0 DB16-20 methodology compare
- 161 Ukraine 0 DB16-20 methodology compare
- 161 Vanuatu 0 DB16-20 methodology compare
- 161 Zimbabwe 0 DB16-20 methodology compare
More private sector data for Equatorial Guinea
- Merchandise trade 33.5% (2025)
- Food imports 31.8% (1983)
- Manufactures imports 64.2% (1983)
- Merchandise imports 1.70 billion current US$ (2025)
- Food exports 57.9% (1983)
- Manufactures exports 4.0% (1983)
- Merchandise exports 2.60 billion current US$ (2025)
- Commercial service exports 4.88 million current US$ (1996)
- Commercial service imports 184.58 million current US$ (1996)
- Merchandise imports from economies in the Arab World 2.9% (2023)
Frequently asked questions
- What is dealing with construction permits: quality control before construction in Equatorial Guinea?
- Dealing with construction permits: quality control before construction in Equatorial Guinea was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control before construction recorded in Equatorial Guinea?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control before construction recorded in Equatorial Guinea?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Equatorial Guinea rank for dealing with construction permits: quality control before construction?
- Equatorial Guinea ranks 161st out of 183 countries with data for 2019.
- Where does this Equatorial Guinea data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.