Dealing with construction permits: Quality control before in Antigua and Barbuda

Antigua and Barbuda: Dealing with construction permits: Quality control before was 0 DB16-20 methodology in 2019. β–¬ Flat

Latest (2019)
0 DB16-20 methodology
World rank
163rd
of 185 countries
All-time high
0 DB16-20 methodology
in 2014
All-time low
0 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control before in Antigua and Barbuda, 2014–2019

00.20.40.60.812014201620192014: 0 DB16-20 methodology2015: 0 DB16-20 methodology2016: 0 DB16-20 methodology2017: 0 DB16-20 methodology2018: 0 DB16-20 methodology2019: 0 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: quality control before in Antigua and Barbuda is 0 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

Antigua and Barbuda ranks 163rd of 185 countries on this measure, in the bottom quarter.

Countries ranked near Antigua and Barbuda

  1. 163 Austria 0 DB16-20 methodology compare
  2. 163 Barbados 0 DB16-20 methodology compare
  3. 163 Botswana 0 DB16-20 methodology compare
  4. 163 Burundi 0 DB16-20 methodology compare
  5. 163 Chad 0 DB16-20 methodology compare
  6. 163 Croatia 0 DB16-20 methodology compare
  7. 163 Czechia 0 DB16-20 methodology compare
  8. 163 Equatorial Guinea 0 DB16-20 methodology compare
  9. 163 Guyana 0 DB16-20 methodology compare
  10. 163 Italy 0 DB16-20 methodology compare
  11. 163 Korea 0 DB16-20 methodology compare
  12. 163 Marshall Islands 0 DB16-20 methodology compare
  13. 163 Micronesia 0 DB16-20 methodology compare
  14. 163 Palau 0 DB16-20 methodology compare
  15. 163 Sao Tome and Principe 0 DB16-20 methodology compare
  16. 163 Seychelles 0 DB16-20 methodology compare
  17. 163 Slovak Republic 0 DB16-20 methodology compare
  18. 163 Sri Lanka 0 DB16-20 methodology compare
  19. 163 Timor-Leste 0 DB16-20 methodology compare
  20. 163 Ukraine 0 DB16-20 methodology compare
  21. 163 Vanuatu 0 DB16-20 methodology compare
  22. 163 Zimbabwe 0 DB16-20 methodology compare

See the full ranking of 185 places β†’

More private sector data for Antigua and Barbuda

All data for Antigua and Barbuda β†’

Frequently asked questions

What is dealing with construction permits: quality control before in Antigua and Barbuda?
Dealing with construction permits: quality control before in Antigua and Barbuda was 0 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control before recorded in Antigua and Barbuda?
The highest recorded value was 0 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control before recorded in Antigua and Barbuda?
The lowest recorded value was 0 DB16-20 methodology in 2014.
How does Antigua and Barbuda rank for dealing with construction permits: quality control before?
Antigua and Barbuda ranks 163rd out of 185 countries with data for 2019.
Where does this Antigua and Barbuda data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control before in Antigua and Barbuda. Statizoid. Retrieved 20 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/antigua-and-barbuda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-before-construction-index-0-1-db16-20/antigua-and-barbuda/">Dealing with construction permits: Quality control before in Antigua and Barbuda</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.