Dealing with construction permits: Quality control before construction in Marshall Islands
Marshall Islands: Dealing with construction permits: Quality control before construction was 0 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control before construction in Marshall Islands, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
The most recent figure for dealing with construction permits: quality control before construction in Marshall Islands is 0 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.
Marshall Islands ranks 161st of 183 countries on this measure, in the bottom quarter.
Countries ranked near Marshall Islands
- 161 Antigua and Barbuda 0 DB16-20 methodology compare
- 161 Austria 0 DB16-20 methodology compare
- 161 Barbados 0 DB16-20 methodology compare
- 161 Botswana 0 DB16-20 methodology compare
- 161 Burundi 0 DB16-20 methodology compare
- 161 Chad 0 DB16-20 methodology compare
- 161 Croatia 0 DB16-20 methodology compare
- 161 Czechia 0 DB16-20 methodology compare
- 161 Equatorial Guinea 0 DB16-20 methodology compare
- 161 Guyana 0 DB16-20 methodology compare
- 161 Italy 0 DB16-20 methodology compare
- 161 South Korea 0 DB16-20 methodology compare
- 161 Micronesia (country) 0 DB16-20 methodology compare
- 161 Palau 0 DB16-20 methodology compare
- 161 Sao Tome and Principe 0 DB16-20 methodology compare
- 161 Seychelles 0 DB16-20 methodology compare
- 161 Slovakia 0 DB16-20 methodology compare
- 161 Sri Lanka 0 DB16-20 methodology compare
- 161 East Timor 0 DB16-20 methodology compare
- 161 Ukraine 0 DB16-20 methodology compare
- 161 Vanuatu 0 DB16-20 methodology compare
- 161 Zimbabwe 0 DB16-20 methodology compare
More private sector data for Marshall Islands
- Merchandise trade 59.4% (2025)
- Merchandise imports 111.00 million current US$ (2025)
- Merchandise exports 72.00 million current US$ (2025)
- Commercial service exports 19.38 million current US$ (2024)
- Transport services 52.2% (2024)
- Computer, communications and other services 27.5% (2024)
- Commercial service imports 64.21 million current US$ (2024)
- Computer, communications and other services 20.2% (2024)
- Travel services 20.3% (2024)
- Travel services 51.1% (2024)
Frequently asked questions
- What is dealing with construction permits: quality control before construction in Marshall Islands?
- Dealing with construction permits: quality control before construction in Marshall Islands was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control before construction recorded in Marshall Islands?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control before construction recorded in Marshall Islands?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Marshall Islands rank for dealing with construction permits: quality control before construction?
- Marshall Islands ranks 161st out of 183 countries with data for 2019.
- Where does this Marshall Islands data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control before construction index (0-1) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control before construction index evaluates quality control in the review of the building plans. The index measures whether by law, a licensed architect or engineer is part of the committee or team that reviews and approves building permit applications and whether that person has the authority to refuse an application if the plans are not in conformity with regulations. The index is computed based on the methodology in the DB16-20 studies.