Dealing with construction permits: Time (days) - Score in Romania

Romania: Dealing with construction permits: Time (days) - Score was 32.56 in 2019. ▼ Falling

Latest (2019)
32.56
Change on year
unchanged
World rank
169th
of 188 countries
All-time high
51.87
in 2005
All-time low
32.56
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Time (days) - Score in Romania, 2005–2019

02040602005201220192005: 51.92006: 51.92007: 51.62008: 51.62009: 51.62010: 48.12011: 47.82012: 47.82013: 47.82014: 47.82015: 32.62016: 32.62017: 32.62018: 32.62019: 32.6

Source: World Bank.

Analysis

Romania recorded 32.56 for dealing with construction permits: time (days) - score in 2019. That is the lowest value across all 15 years on record.

The figure is down 36.9% over ten years.

Over the whole period, dealing with construction permits: time (days) - score in Romania peaked at 51.87 in 2005 and was at its lowest, 32.56, in 2015.

Romania ranks 169th of 188 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 51.7 51.59 51.87 5
2010s 40.23 32.56 48.13 10

Countries ranked near Romania

  1. 166 Canada 35.73 compare
  2. 167 Trinidad and Tobago 34.29 compare
  3. 168 Sudan 34.01 compare
  4. 170 Uruguay 31.12 compare
  5. 171 Bangladesh 28.67 compare
  6. 172 Gabon 28.24 compare

See the full ranking of 190 places →

More private sector data for Romania

All data for Romania →

Frequently asked questions

What is dealing with construction permits: time (days) - score in Romania?
Dealing with construction permits: time (days) - score in Romania was 32.56 in 2019, according to the World Bank.
What is the highest dealing with construction permits: time (days) - score recorded in Romania?
The highest recorded value was 51.87 in 2005.
What is the lowest dealing with construction permits: time (days) - score recorded in Romania?
The lowest recorded value was 32.56 in 2015.
How does Romania rank for dealing with construction permits: time (days) - score?
Romania ranks 169th out of 188 countries with data for 2019.
Is dealing with construction permits: time (days) - score rising or falling in Romania?
Over the last ten years it is down 36.9%. The long-run trend across the full record is falling.
Where does this Romania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days) - Score. Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
190 places, 2,783 data points, 2005–2019
Last refreshed

The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.