Dealing with construction permits: Time (days) (Time days) in Ireland

Ireland: Dealing with construction permits: Time was 164 days in 2019. ▲ Rising

Latest (2019)
164 days
Change on year
unchanged
World rank
68th
of 188 countries
All-time high
164 days
in 2014
All-time low
144.5 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Ireland, 2005–2019

0501001502005201220192005: 144.5 days2006: 144.5 days2007: 144.5 days2008: 144.5 days2009: 144.5 days2010: 145.5 days2011: 145.5 days2012: 145.5 days2013: 145.5 days2014: 164 days2015: 164 days2016: 164 days2017: 164 days2018: 164 days2019: 164 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Ireland stood at 164 days. That is the highest value across all 15 years on record.

That represents a change of up 13.5% over ten years.

Over the whole period, dealing with construction permits: time in Ireland peaked at 164 days in 2014 and was at its lowest, 144.5 days, in 2005.

That places Ireland 68th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time in Ireland, year by year

Annual values for Dealing with construction permits: Time (days) in Ireland, 2005 to 2019.
Year days Change
2005 144.5 days —
2006 144.5 days +0.0%
2007 144.5 days +0.0%
2008 144.5 days +0.0%
2009 144.5 days +0.0%
2010 145.5 days +0.7%
2011 145.5 days +0.0%
2012 145.5 days +0.0%
2013 145.5 days +0.0%
2014 164 days +12.7%
2015 164 days +0.0%
2016 164 days +0.0%
2017 164 days +0.0%
2018 164 days +0.0%
2019 164 days +0.0%

Ireland compared with similar countries

  • Ireland's 164 days is above the median for high income countries, which is 144.75 days, 1.1× the median. (62 countries reporting)
  • Ireland's 164 days is above the median for Europe & Central Asia, which is 156 days, 1.1× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 144.5 days 144.5 days 144.5 days 5
2010s 156.6 days 145.5 days 164 days 10

Countries ranked near Ireland

  1. 65 Vietnam 166 days compare
  2. 66 Puerto Rico 165 days compare
  3. 67 Russia 164.5 days compare
  4. 68 Congo 164 days compare
  5. 70 Cote d'Ivoire 163 days compare
  6. 71 Netherlands 161 days compare

See the full ranking of 188 places →

More private sector data for Ireland

All data for Ireland →

Frequently asked questions

What is dealing with construction permits: time in Ireland?
Dealing with construction permits: time in Ireland was 164 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Ireland?
The highest recorded value was 164 days in 2014.
What is the lowest dealing with construction permits: time recorded in Ireland?
The lowest recorded value was 144.5 days in 2005.
How does Ireland rank for dealing with construction permits: time?
Ireland ranks 68th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Ireland?
Over the last ten years it is up 13.5%. The long-run trend across the full record is rising.
Where does this Ireland data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Ireland. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/ireland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/ireland/">Dealing with construction permits: Time in Ireland</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.