Getting electricity: Minimum outage time (in minutes) in Brazil
Brazil: Getting electricity: Minimum outage time (in minutes) was 3 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Brazil, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Brazil recorded 3 DB16-20 methodology for getting electricity: minimum outage time (in minutes) in 2019. That is the highest value across all 6 years on record.
That represents a change of unchanged over ten years.
That places Brazil 48th out of 135 countries with data for 2019, putting it in the middle of the range.
Countries ranked near Brazil
- 46 United States 4.2 DB16-20 methodology compare
- 47 Tanzania 4 DB16-20 methodology compare
- 48 China 3 DB16-20 methodology compare
- 48 Pakistan 3 DB16-20 methodology compare
- 48 Algeria 3 DB16-20 methodology compare
- 48 Argentina 3 DB16-20 methodology compare
- 48 Australia 3 DB16-20 methodology compare
- 48 Austria 3 DB16-20 methodology compare
- 48 Azerbaijan 3 DB16-20 methodology compare
- 48 Belgium 3 DB16-20 methodology compare
- 48 Bolivia 3 DB16-20 methodology compare
- 48 Bosnia and Herzegovina 3 DB16-20 methodology compare
- 48 Bulgaria 3 DB16-20 methodology compare
- 48 Chile 3 DB16-20 methodology compare
- 48 Colombia 3 DB16-20 methodology compare
- 48 Croatia 3 DB16-20 methodology compare
- 48 Czechia 3 DB16-20 methodology compare
- 48 Dominican Republic 3 DB16-20 methodology compare
- 48 Ecuador 3 DB16-20 methodology compare
- 48 El Salvador 3 DB16-20 methodology compare
- 48 Estonia 3 DB16-20 methodology compare
- 48 France 3 DB16-20 methodology compare
- 48 Georgia 3 DB16-20 methodology compare
- 48 Germany 3 DB16-20 methodology compare
- 48 Greece 3 DB16-20 methodology compare
- 48 Guatemala 3 DB16-20 methodology compare
- 48 Hungary 3 DB16-20 methodology compare
- 48 Ireland 3 DB16-20 methodology compare
- 48 Italy 3 DB16-20 methodology compare
- 48 Latvia 3 DB16-20 methodology compare
- 48 Lithuania 3 DB16-20 methodology compare
- 48 Mauritius 3 DB16-20 methodology compare
- 48 Moldova 3 DB16-20 methodology compare
- 48 Nicaragua 3 DB16-20 methodology compare
- 48 North Macedonia 3 DB16-20 methodology compare
- 48 Norway 3 DB16-20 methodology compare
- 48 Panama 3 DB16-20 methodology compare
- 48 Paraguay 3 DB16-20 methodology compare
- 48 Peru 3 DB16-20 methodology compare
- 48 Poland 3 DB16-20 methodology compare
- 48 Portugal 3 DB16-20 methodology compare
- 48 Romania 3 DB16-20 methodology compare
- 48 Serbia 3 DB16-20 methodology compare
- 48 Slovakia 3 DB16-20 methodology compare
- 48 Slovenia 3 DB16-20 methodology compare
- 48 Spain 3 DB16-20 methodology compare
- 48 Sweden 3 DB16-20 methodology compare
- 48 Switzerland 3 DB16-20 methodology compare
- 48 Ukraine 3 DB16-20 methodology compare
- 48 United Kingdom 3 DB16-20 methodology compare
- 48 Uruguay 3 DB16-20 methodology compare
- 48 Vanuatu 3 DB16-20 methodology compare
More private sector data for Brazil
- Merchandise trade 28.2% (2025)
- Food imports 5.5% (2025)
- Manufactures imports 79.7% (2025)
- Merchandise imports 293.70 billion current US$ (2025)
- Food exports 40.7% (2025)
- Manufactures exports 23.8% (2025)
- Merchandise exports 348.28 billion current US$ (2025)
- Commercial service exports 53.53 billion current US$ (2025)
- Transport services 21.1% (2025)
- Computer, communications and other services 54.3% (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Brazil?
- Getting electricity: minimum outage time (in minutes) in Brazil was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Brazil?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Brazil?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Brazil rank for getting electricity: minimum outage time (in minutes)?
- Brazil ranks 48th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Brazil?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Brazil data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.