Getting electricity: Minimum outage time (in minutes) in Peru
Peru: Getting electricity: Minimum outage time (in minutes) was 3 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Peru, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, getting electricity: minimum outage time (in minutes) in Peru stood at 3 DB16-20 methodology. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Peru ranks 48th of 135 countries on this measure, in the middle of the range.
Countries ranked near Peru
- 46 United States 4.2 DB16-20 methodology compare
- 47 Tanzania 4 DB16-20 methodology compare
- 48 China 3 DB16-20 methodology compare
- 48 Pakistan 3 DB16-20 methodology compare
- 48 Brazil 3 DB16-20 methodology compare
- 48 Algeria 3 DB16-20 methodology compare
- 48 Argentina 3 DB16-20 methodology compare
- 48 Australia 3 DB16-20 methodology compare
- 48 Austria 3 DB16-20 methodology compare
- 48 Azerbaijan 3 DB16-20 methodology compare
- 48 Belgium 3 DB16-20 methodology compare
- 48 Bolivia 3 DB16-20 methodology compare
- 48 Bosnia and Herzegovina 3 DB16-20 methodology compare
- 48 Bulgaria 3 DB16-20 methodology compare
- 48 Chile 3 DB16-20 methodology compare
- 48 Colombia 3 DB16-20 methodology compare
- 48 Croatia 3 DB16-20 methodology compare
- 48 Czechia 3 DB16-20 methodology compare
- 48 Dominican Republic 3 DB16-20 methodology compare
- 48 Ecuador 3 DB16-20 methodology compare
- 48 El Salvador 3 DB16-20 methodology compare
- 48 Estonia 3 DB16-20 methodology compare
- 48 France 3 DB16-20 methodology compare
- 48 Georgia 3 DB16-20 methodology compare
- 48 Germany 3 DB16-20 methodology compare
- 48 Greece 3 DB16-20 methodology compare
- 48 Guatemala 3 DB16-20 methodology compare
- 48 Hungary 3 DB16-20 methodology compare
- 48 Ireland 3 DB16-20 methodology compare
- 48 Italy 3 DB16-20 methodology compare
- 48 Latvia 3 DB16-20 methodology compare
- 48 Lithuania 3 DB16-20 methodology compare
- 48 Mauritius 3 DB16-20 methodology compare
- 48 Moldova 3 DB16-20 methodology compare
- 48 Nicaragua 3 DB16-20 methodology compare
- 48 North Macedonia 3 DB16-20 methodology compare
- 48 Norway 3 DB16-20 methodology compare
- 48 Panama 3 DB16-20 methodology compare
- 48 Paraguay 3 DB16-20 methodology compare
- 48 Poland 3 DB16-20 methodology compare
- 48 Portugal 3 DB16-20 methodology compare
- 48 Romania 3 DB16-20 methodology compare
- 48 Serbia 3 DB16-20 methodology compare
- 48 Slovakia 3 DB16-20 methodology compare
- 48 Slovenia 3 DB16-20 methodology compare
- 48 Spain 3 DB16-20 methodology compare
- 48 Sweden 3 DB16-20 methodology compare
- 48 Switzerland 3 DB16-20 methodology compare
- 48 Ukraine 3 DB16-20 methodology compare
- 48 United Kingdom 3 DB16-20 methodology compare
- 48 Uruguay 3 DB16-20 methodology compare
- 48 Vanuatu 3 DB16-20 methodology compare
More private sector data for Peru
- Merchandise trade 42.8% (2025)
- Food imports 11.9% (2024)
- Manufactures imports 68.2% (2024)
- Merchandise imports 60.63 billion current US$ (2025)
- Food exports 21.2% (2024)
- Manufactures exports 7.4% (2024)
- Merchandise exports 82.69 billion current US$ (2025)
- Commercial service exports 7.45 billion current US$ (2025)
- Transport services 32.3% (2025)
- Computer, communications and other services 34.7% (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Peru?
- Getting electricity: minimum outage time (in minutes) in Peru was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Peru?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Peru?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Peru rank for getting electricity: minimum outage time (in minutes)?
- Peru ranks 48th out of 135 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Peru?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Peru data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.