Getting electricity: Minimum outage time (in minutes) in Pakistan
Pakistan: Getting electricity: Minimum outage time (in minutes) was 3 DB16-20 methodology in 2019. ▬ Flat
Getting electricity: Minimum outage time (in minutes) in Pakistan, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, getting electricity: minimum outage time (in minutes) in Pakistan stood at 3 DB16-20 methodology. That is the highest value across all 6 years on record.
The figure is unchanged over ten years.
Pakistan ranks 48th of 136 countries on this measure, in the middle of the range.
Countries ranked near Pakistan
- 46 United States 4.2 DB16-20 methodology compare
- 47 Tanzania, United Republic of 4 DB16-20 methodology compare
- 48 China (People’s Republic of) 3 DB16-20 methodology compare
- 48 Brazil 3 DB16-20 methodology compare
- 48 Algeria 3 DB16-20 methodology compare
- 48 Argentina 3 DB16-20 methodology compare
- 48 Australia 3 DB16-20 methodology compare
- 48 Austria 3 DB16-20 methodology compare
- 48 Azerbaijan 3 DB16-20 methodology compare
- 48 Belgium 3 DB16-20 methodology compare
- 48 Bolivia 3 DB16-20 methodology compare
- 48 Bosnia and Herzegovina 3 DB16-20 methodology compare
- 48 Bulgaria 3 DB16-20 methodology compare
- 48 Chile 3 DB16-20 methodology compare
- 48 Colombia 3 DB16-20 methodology compare
- 48 Croatia 3 DB16-20 methodology compare
- 48 Czechia 3 DB16-20 methodology compare
- 48 Dominican Republic 3 DB16-20 methodology compare
- 48 Ecuador 3 DB16-20 methodology compare
- 48 El Salvador 3 DB16-20 methodology compare
- 48 Estonia 3 DB16-20 methodology compare
- 48 France 3 DB16-20 methodology compare
- 48 Georgia 3 DB16-20 methodology compare
- 48 Germany 3 DB16-20 methodology compare
- 48 Greece 3 DB16-20 methodology compare
- 48 Guatemala 3 DB16-20 methodology compare
- 48 Hungary 3 DB16-20 methodology compare
- 48 Ireland 3 DB16-20 methodology compare
- 48 Italy 3 DB16-20 methodology compare
- 48 Latvia 3 DB16-20 methodology compare
- 48 Lithuania 3 DB16-20 methodology compare
- 48 Mauritius 3 DB16-20 methodology compare
- 48 Moldova 3 DB16-20 methodology compare
- 48 Nicaragua 3 DB16-20 methodology compare
- 48 North Macedonia 3 DB16-20 methodology compare
- 48 Norway 3 DB16-20 methodology compare
- 48 Panama 3 DB16-20 methodology compare
- 48 Paraguay 3 DB16-20 methodology compare
- 48 Peru 3 DB16-20 methodology compare
- 48 Poland 3 DB16-20 methodology compare
- 48 Portugal 3 DB16-20 methodology compare
- 48 Romania 3 DB16-20 methodology compare
- 48 Serbia 3 DB16-20 methodology compare
- 48 Slovak Republic 3 DB16-20 methodology compare
- 48 Slovenia 3 DB16-20 methodology compare
- 48 Spain 3 DB16-20 methodology compare
- 48 Sweden 3 DB16-20 methodology compare
- 48 Switzerland 3 DB16-20 methodology compare
- 48 Ukraine 3 DB16-20 methodology compare
- 48 United Kingdom 3 DB16-20 methodology compare
- 48 Uruguay 3 DB16-20 methodology compare
- 48 Vanuatu 3 DB16-20 methodology compare
More private sector data for Pakistan
- Merchandise trade 23.7% (2025)
- Food imports 14.1% (2024)
- Manufactures imports 46.1% (2024)
- Merchandise imports 65.85 billion current US$ (2025)
- Food exports 24.4% (2024)
- Manufactures exports 67.9% (2024)
- Merchandise exports 30.55 billion current US$ (2025)
- Merchandise exports (current US$), per capita 119.68 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.075 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate -5.49 % change on previous year (2025)
Frequently asked questions
- What is getting electricity: minimum outage time (in minutes) in Pakistan?
- Getting electricity: minimum outage time (in minutes) in Pakistan was 3 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest getting electricity: minimum outage time (in minutes) recorded in Pakistan?
- The highest recorded value was 3 DB16-20 methodology in 2014.
- What is the lowest getting electricity: minimum outage time (in minutes) recorded in Pakistan?
- The lowest recorded value was 3 DB16-20 methodology in 2014.
- How does Pakistan rank for getting electricity: minimum outage time (in minutes)?
- Pakistan ranks 48th out of 136 countries with data for 2019.
- Is getting electricity: minimum outage time (in minutes) rising or falling in Pakistan?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Pakistan data come from?
- The figures come from the World Bank, published as part of Getting electricity: Minimum outage time (in minutes) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The minimum outage time is the minimum time, in minutes, considered for the calculation of the SAIDI and SAIFI indices. If the minimum outage time exceeds 5 minutes, an economy is not eligible to obtain a score on the Reliability of supply and transparency of tariff index component. The index is computed based on the methodology in the DB16-20 studies.