Dealing with construction permits: Quality control after construction in Afghanistan, Islamic Republic of
Afghanistan, Islamic Republic of: Dealing with construction permits: Quality control after construction was 0 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control after construction in Afghanistan, Islamic Republic of, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control after construction in Afghanistan, Islamic Republic of stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.
That places Afghanistan, Islamic Republic of 178th out of 185 countries with data for 2019, putting it in the bottom quarter.
Countries ranked near Afghanistan, Islamic Republic of
- 178 Equatorial Guinea, Republic of 0 DB16-20 methodology compare
- 178 Liberia 0 DB16-20 methodology compare
- 178 Maldives 0 DB16-20 methodology compare
- 178 Marshall Islands, Republic of the 0 DB16-20 methodology compare
- 178 Micronesia, Federated States of 0 DB16-20 methodology compare
- 178 Nicaragua 0 DB16-20 methodology compare
- 178 Samoa 0 DB16-20 methodology compare
More private sector data for Afghanistan, Islamic Republic of
- Merchandise trade 22.2% (2025)
- Food imports 26.9% (2019)
- Manufactures imports 41.1% (2019)
- Merchandise imports 3.61 billion current US$ (2025)
- Food exports 63.9% (2019)
- Manufactures exports 4.8% (2019)
- Merchandise exports 926.00 million current US$ (2025)
- Merchandise exports (current US$), per capita 21.12 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.0517 current US$ per US$ of GDP (2024)
- Merchandise exports (current US$), annual growth rate 0.7617 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: quality control after construction in Afghanistan, Islamic Republic of?
- Dealing with construction permits: quality control after construction in Afghanistan, Islamic Republic of was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control after construction recorded in Afghanistan, Islamic Republic of?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control after construction recorded in Afghanistan, Islamic Republic of?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Afghanistan, Islamic Republic of rank for dealing with construction permits: quality control after construction?
- Afghanistan, Islamic Republic of ranks 178th out of 185 countries with data for 2019.
- Where does this Afghanistan, Islamic Republic of data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.