Dealing with construction permits: Quality control after construction in Nicaragua

Nicaragua: Dealing with construction permits: Quality control after construction was 0 DB16-20 methodology in 2019. β–¬ Flat

Latest (2019)
0 DB16-20 methodology
World rank
178th
of 185 countries
All-time high
0 DB16-20 methodology
in 2014
All-time low
0 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Quality control after construction in Nicaragua, 2014–2019

00.20.40.60.812014201620192014: 0 DB16-20 methodology2015: 0 DB16-20 methodology2016: 0 DB16-20 methodology2017: 0 DB16-20 methodology2018: 0 DB16-20 methodology2019: 0 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

In 2019, dealing with construction permits: quality control after construction in Nicaragua stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.

Nicaragua ranks 178th of 185 countries on this measure, in the bottom quarter.

Countries ranked near Nicaragua

  1. 178 Afghanistan, Islamic Republic of 0 DB16-20 methodology compare
  2. 178 Equatorial Guinea, Republic of 0 DB16-20 methodology compare
  3. 178 Liberia 0 DB16-20 methodology compare
  4. 178 Maldives 0 DB16-20 methodology compare
  5. 178 Marshall Islands, Republic of the 0 DB16-20 methodology compare
  6. 178 Micronesia, Federated States of 0 DB16-20 methodology compare
  7. 178 Samoa 0 DB16-20 methodology compare

See the full ranking of 185 places β†’

More private sector data for Nicaragua

All data for Nicaragua β†’

Frequently asked questions

What is dealing with construction permits: quality control after construction in Nicaragua?
Dealing with construction permits: quality control after construction in Nicaragua was 0 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: quality control after construction recorded in Nicaragua?
The highest recorded value was 0 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: quality control after construction recorded in Nicaragua?
The lowest recorded value was 0 DB16-20 methodology in 2014.
How does Nicaragua rank for dealing with construction permits: quality control after construction?
Nicaragua ranks 178th out of 185 countries with data for 2019.
Where does this Nicaragua data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Quality control after construction in Nicaragua. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/nicaragua/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-quality-control-after-construction-index-0-3-db16-20/nicaragua/">Dealing with construction permits: Quality control after construction in Nicaragua</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.