Dealing with construction permits: Quality control after construction in Nicaragua
Nicaragua: Dealing with construction permits: Quality control after construction was 0 DB16-20 methodology in 2019. β¬ Flat
Dealing with construction permits: Quality control after construction in Nicaragua, 2014β2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control after construction in Nicaragua stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.
Nicaragua ranks 178th of 185 countries on this measure, in the bottom quarter.
Countries ranked near Nicaragua
- 178 Afghanistan, Islamic Republic of 0 DB16-20 methodology compare
- 178 Equatorial Guinea, Republic of 0 DB16-20 methodology compare
- 178 Liberia 0 DB16-20 methodology compare
- 178 Maldives 0 DB16-20 methodology compare
- 178 Marshall Islands, Republic of the 0 DB16-20 methodology compare
- 178 Micronesia, Federated States of 0 DB16-20 methodology compare
- 178 Samoa 0 DB16-20 methodology compare
More private sector data for Nicaragua
- Merchandise trade 95.9% (2025)
- Food imports 16.6% (2024)
- Manufactures imports 68.6% (2024)
- Merchandise imports 12.43 billion current US$ (2025)
- Food exports 42.6% (2024)
- Manufactures exports 37.0% (2024)
- Merchandise exports 8.89 billion current US$ (2025)
- Merchandise exports (current US$), per capita 1,269 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.3999 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 18.23 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: quality control after construction in Nicaragua?
- Dealing with construction permits: quality control after construction in Nicaragua was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control after construction recorded in Nicaragua?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control after construction recorded in Nicaragua?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Nicaragua rank for dealing with construction permits: quality control after construction?
- Nicaragua ranks 178th out of 185 countries with data for 2019.
- Where does this Nicaragua data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV Β· JSON β 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.