Dealing with construction permits: Quality control after construction in Micronesia (country)
Micronesia (country): Dealing with construction permits: Quality control after construction was 0 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Quality control after construction in Micronesia (country), 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
In 2019, dealing with construction permits: quality control after construction in Micronesia (country) stood at 0 DB16-20 methodology. That is the highest value across all 6 years on record.
Micronesia (country) ranks 176th of 183 countries on this measure, in the bottom quarter.
Countries ranked near Micronesia (country)
- 176 Afghanistan 0 DB16-20 methodology compare
- 176 Equatorial Guinea 0 DB16-20 methodology compare
- 176 Liberia 0 DB16-20 methodology compare
- 176 Maldives 0 DB16-20 methodology compare
- 176 Marshall Islands 0 DB16-20 methodology compare
- 176 Nicaragua 0 DB16-20 methodology compare
- 176 Samoa 0 DB16-20 methodology compare
More private sector data for Micronesia (country)
- Merchandise trade 83.5% (2025)
- Food imports 27.8% (2013)
- Manufactures imports 36.1% (2013)
- Merchandise imports 310.00 million current US$ (2025)
- Food exports 99.2% (2013)
- Manufactures exports 0.5% (2013)
- Merchandise exports 109.00 million current US$ (2025)
- Commercial service exports 33.42 million current US$ (2014)
- Transport services 56.9% (2014)
- Computer, communications and other services 24.2% (2014)
Frequently asked questions
- What is dealing with construction permits: quality control after construction in Micronesia (country)?
- Dealing with construction permits: quality control after construction in Micronesia (country) was 0 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: quality control after construction recorded in Micronesia (country)?
- The highest recorded value was 0 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: quality control after construction recorded in Micronesia (country)?
- The lowest recorded value was 0 DB16-20 methodology in 2014.
- How does Micronesia (country) rank for dealing with construction permits: quality control after construction?
- Micronesia (country) ranks 176th out of 183 countries with data for 2019.
- Where does this Micronesia (country) data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.