Dealing with construction permits: Time in South Africa

South Africa: Dealing with construction permits: Time was 155 days in 2019. ▬ Flat

Latest (2019)
155 days
Change on year
unchanged
World rank
76th
of 185 countries
All-time high
155 days
in 2014
All-time low
153 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in South Africa, 2005–2019

0501001502005201220192005: 153 days2006: 153 days2007: 153 days2008: 153 days2009: 153 days2010: 153 days2011: 153 days2012: 153 days2013: 153 days2014: 155 days2015: 155 days2016: 155 days2017: 155 days2018: 155 days2019: 155 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in South Africa is 155 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is up 1.3% over ten years.

Over the whole period, dealing with construction permits: time in South Africa peaked at 155 days in 2014 and was at its lowest, 153 days, in 2005.

That places South Africa 76th out of 185 countries with data for 2019, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 153 days 153 days 153 days 5
2010s 154.2 days 153 days 155 days 10

Countries ranked near South Africa

  1. 73 Belarus 158 days compare
  2. 74 Tajikistan 157 days compare
  3. 75 Switzerland 156 days compare
  4. 76 Luxembourg 155 days compare
  5. 78 Malawi 153 days compare
  6. 79 Guinea 151 days compare

See the full ranking of 187 places →

More private sector data for South Africa

All data for South Africa →

Frequently asked questions

What is dealing with construction permits: time in South Africa?
Dealing with construction permits: time in South Africa was 155 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in South Africa?
The highest recorded value was 155 days in 2014.
What is the lowest dealing with construction permits: time recorded in South Africa?
The lowest recorded value was 153 days in 2005.
How does South Africa rank for dealing with construction permits: time?
South Africa ranks 76th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in South Africa?
Over the last ten years it is up 1.3%. The long-run trend across the full record is flat.
Where does this South Africa data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.